Module 1 Conditions and Location

Survey Location

Stream Name: BOWKER CREEK Survey Date: 2020-08-30
Organization: Friends of Bowker Creek Project: Bowker Creek Salmon Recovery
Survey ID: 109 Watershed Code: 920-370-0190
Contact Name: stormy kirkland Crew Size: 3
Crew Names: Stormy Kirkland, Daniel Rychtera and Charlotte Masemann Contact Phone: 250-589-7483
Segment Number: 3 Section Number: 3.7
Data entered by: Stormy Kirkland | Survey Duration: 2.00 Length Surveyed: 57.53m

Survey Start Point

Mapsheet Number: 092B044 Mapsheet Type: TRIM Mapsheet Scale: 1:20,000
Start Location Description:
Bee Street Culvert (downstream) and channelized in commercial to Cadbaro Bay Road
Start Location Latitude: 0.00000 Start Location Longitude: 0.00000 Survey Start Time: 13:00:00
Start Location Weather Description: Clear Start Location Water Turbidity: 0-25cm
Start Location Water Temperature: 17.00 Start Location Air Temperature: 17.00
Measurements Taken Every: 0.5

Number of Measurements: 15
Start Location Wetted Width: 3.60
Start Location Wetted Depth: 0.079
Start Location Bankful Width: 3.60
Start Location Bankful Depth: 0.687

Start Point Cross Section (First and Last Measurements taken 0.1 m from streambank)

Left Bank 0.10 0.60 1.10 1.60 2.10 2.60 3.10 3.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Right Bank
Wetted Depth 0.14 0.15 0.13 0.15 0.15 0.15 0.16 0.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Wetted Depth
Bankfull Depth 1.28 1.29 1.27 1.29 1.29 1.29 1.30 1.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Bankfull Depth

Survey End Point

End Location Description: End point at the start of Cadbaro Bay Road culvert.
End Location Latitude: 0.00000 End Location Longitude: 0.00000 Survey End Time: 15:04:00
End Location Weather Description: Overcast End Location Water Turbidity: 25-50cm
End Location Water Temperature: 17.00 End Location Air Temperature: 18.00
Measurements Taken Every: 0.5

Number of Measurements: 15
End Location Wetted Width: 3.00
End Location Wetted Depth: 0.12466666666667
End Location Bankful Width: 3.00
End Location Bankful Depth: 0.55866666666667

End Point Cross Section (First and Last Measurements taken 0.1 m from streambank)

Left Bank 0.10 0.60 1.10 1.60 2.10 2.60 2.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Right Bank
Wetted Depth 0.29 0.30 0.30 0.29 0.26 0.22 0.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Wetted Depth
Bankfull Depth 1.22 1.23 1.23 1.22 1.19 1.15 1.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Bankfull Depth
https://www.youtube.com/watch?v=Q-bQzGDJ9oE