Module 1 Conditions and Location
Survey Location
Stream Name: BOWKER CREEK | Survey Date: 2021-08-22 | |
Organization: Friends of Bowker Creek | Project: Friends of Bowker Creek | |
Survey ID: 115 | Watershed Code: 920106800 | |
Contact Name: Gerald Harris | Crew Size: 3 | |
Crew Names: Gerald HarrisrnChristopher ShepherdrnTina Chen | Contact Phone: 250-730-0190 | |
Segment Number: 1 | Section Number: 1.3 | |
Data entered by: Ciaran | Survey Duration: 1.00 | Length Surveyed: unknown |
Survey Start Point
Mapsheet Number: 092B044 | Mapsheet Type: TRIM | Mapsheet Scale: 1:20,000 |
Start Location Description: Lower end of 1.3 |
||
Start Location Latitude: 0.00000 | Start Location Longitude: 0.00000 | Survey Start Time: 13:15:00 |
Start Location Weather Description: Clear | Start Location Water Turbidity: 25-50cm | |
Start Location Water Temperature: 19.00 | Start Location Air Temperature: 29.00 | |
Measurements Taken Every: 1.0 Number of Measurements: 15 |
Start Location Wetted Width: 1.80 | |
Start Location Wetted Depth: 0.047 | ||
Start Location Bankful Width: 7.70 | ||
Start Location Bankful Depth: 0.500 |
Start Point Cross Section (First and Last Measurements taken 0.1 m from streambank)
Left Bank | 0.10 | 1.10 | 2.10 | 3.10 | 4.10 | 5.10 | 6.10 | 7.30 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | Right Bank |
Wetted Depth | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.70 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | Wetted Depth |
Bankfull Depth | 0.10 | 0.36 | 0.50 | 1.03 | 1.30 | 1.60 | 1.48 | 1.13 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | Bankfull Depth |
Survey End Point
End Location Description: Upper end of section 1.3/ downstream end of culvert. | ||
End Location Latitude: 0.00000 | End Location Longitude: 0.00000 | Survey End Time: 16:00:00 |
End Location Weather Description: Clear | End Location Water Turbidity: 0-25cm | |
End Location Water Temperature: 19.00 | End Location Air Temperature: 25.50 | |
Measurements Taken Every: 2.0 Number of Measurements: 15 |
End Location Wetted Width: 1.80 | |
End Location Wetted Depth: 0 | ||
End Location Bankful Width: 7.70 | ||
End Location Bankful Depth: 0.43666666666667 |
End Point Cross Section (First and Last Measurements taken 0.1 m from streambank)
Left Bank | 0.10 | 12.11 | 10.10 | 8.10 | 6.10 | 4.10 | 2.10 | 0.10 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | Right Bank |
Wetted Depth | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | Wetted Depth |
Bankfull Depth | 0.00 | 0.05 | 0.98 | 0.97 | 2.03 | 1.67 | 0.82 | 0.03 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | Bankfull Depth |