Module 2 - Longitudinal Survey

Pool Habitat

Stream Name: Hurry Creek Survey Date: 2017-06-02
Organization Name: PSKF Project Name: STREAMKEEPERS TRAINI
Stream Segment #: Stream Section #:
Data Entered by: ZoAnn Survey ID: 66

Step 4.1 Longitudinal Survey, Measurements

Length of Survey Site Minimum: 74.400 (m) Actual: 42.700 (m) Photos Taken? no
Upstream Survey Boundary Minimum: 37.200 (m) Actual:42.700 (m) Photos Taken? no
Downstream Survey Boundary Minimum: 37.200 (m) Actual: (m) Photos Taken? no

* distance upstream (Up) of benchmark

Habitat Unit Typebottom of habitat unit*top of habitat unit*length of habitat unit (m)% slopePhoto frame #
Riffle 0.000 8.300 8.300 3.000
Pool 8.300 22.300 14.000 0.000
Riffle 22.300 26.300 4.000 0.000
Pool 26.300 29.200 2.900 0.000
Pool 29.200 42.700 13.500 7.000
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0

* distance downstream (Dn) of benchmark

Habitat Unit Typebottom of habitat unit*top of habitat unit*length of habitat unit (m)% slopePhoto frame #
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0

Step 4.2 Longitudinal Survey, Habitat Quality

1. Streambed material (from 25 samples)
Fines: 16.00 %
Gravel: %
Cobble: 56.00 %
Boulder: 28.00 %
Bedrock: %
Cobble and Boulder Total: 0.00 %
2. % Embeddness 55.00 %
Instream cover
Large Woody debris: 20.00 pieces
Rooted cutbank: number of instances 5.00
4. Percent Pool Habitat
Average % Survey Slope 2.00 %
Total length of pools: 30.4
Length of Reference Site: 42.7
Pool Habitat: 71.19 %
5. Off Channel Habitat
Details: absent
Size:
Present: none
6. Bank Stability
Active Erosion Left Bank: 1
Active Erosion Left Bank Length: 4.50
Active Erosion Right Bank: 0
Active Erosion Right Bank Length: 0.00
Bank Stabilzation Left Bank: 2
Bank Stabilzation Left Bank Length: 6.00
Bank Stabilzation Right Bank: 0
Bank Stabilzation Right Bank Length: 0.00
Slides Reaching Channel Left Bank: 0
Slides Reaching Channel Left Bank Length: 0.00
Slides Reaching Channel Right Bank: 2
Slides Reaching Channel Right Bank Length: 5.00
7. Length of bank with no vegetation (m)
Left Bank: 0.00
Right Bank: 1.00
8. Overhead Canopy
Bankfull Channel covered by overhanging branches: 56.00 %
9. Riparian zone
# of channel widths: 10.00
Coniferous trees: 0.5
Deciduous trees: 0.25
Shrubs: 0.5
Grass: 0
Adjacent Land Use and Impacts:
We are in the Lower Seymour Conservation Reserve downstream of dam and beautiful area - lots of wilderness and wildlife