's Module 1 Surveys
Stream Name Survey Date Organization Project Name Survey ID Data Entered By
TERMINAL CREEK 2019-07-25 Bowen Island Fish & Wildlife Club 104 ZoAnn Morten

Observation Number Feature Number Photo Taken Photo Upstream from last feature Feature Description Feature Detail Feature Size Bank Affected Adjacent Land Use Action Items
1296 1 No 6.9 SIDE CHANNEL This channel is fed from the mainstem 31.5 metres upstream width is 1.5 metres slow flow Left Parks
1297 2 No 31.5 SIDE CHANNEL here is the upstream end of feature one Left Parks
1298 3 No 18.9 Obstruction-Beaver Dam approx 10cm in height and bank to bank Across Parks watch to see if this is active build site
1299 4 Yes 127.5 Bank Erosion slumping bank Right Parks seam of gravel at the bottom will add substrate as it erodes
1300 5 Yes 18.9 Bank Erosion slump approx 2 metres in length - no human infrastructure in sight. Gravel seam at creek level Right Undisturbed watch this one to see if creek movement happens
1301 6 Yes 11 WATERBODY-Tributary, wetland, ditch, other iron oxcide Right Undisturbed groundwater influence?
1302 7 Yes 30.5 Bank Erosion slump approx 3 m in Length gravel seam Right Undisturbed
1303 8 Yes 64 Modification-Bridge "horse" bridge L = 0.55 mrnW= 12mrnwater to bottom of structure is 1.9mrn Across Parks riprap footing start downstream of this bridge and extend upstream
1304 9 Yes 1.9 Modification-Rip-rap measurement is 1.9 m d/s of foot bridge l= 8m riprap is <0.5 m in size Right Parks "trail" is causing rip rap to fall into creek
1305 10 Yes 0.5 Modification-Rip-rap L = 8.6 m riprap is > 0/5 m in size Left Parks "trail" is causing rip rap to fall into water and landscape cloth is now exposed
Records 1 to 10 of 10