Module 2 - Longitudinal Survey

Stream Name: TACHEK CREEK Survey Date: 2013-07-09
Organization Name: Babine First Nations Project Name:
Stream Segment #: Stream Section #:
Data Entered by: Leanne Olinyk Survey ID: 17

Step 4.1 Longitudinal Survey, Measurements

Length of Survey Site Minimum: 124.800 (m) Actual: 126.500 (m) Photos Taken? no
Upstream Survey Boundary Minimum: 62.400 (m) Actual:64.000 (m) Photos Taken? no
Downstream Survey Boundary Minimum: 62.400 (m) Actual: 62.500(m) Photos Taken? no

* distance upstream (Up) of benchmark

Habitat Unit Typebottom of habitat unit*top of habitat unit*length of habitat unit (m)% slopePhoto frame #
Riffle 0.000 4.000 4.200 1.000 Y
Pool 4.000 11.600 7.500 1.000 Y
Riffle 11.600 15.700 4.200 2.000 Y
Pool 15.700 20.200 4.300 1.000 Y
Riffle 20.200 22.600 2.700 1.000 Y
Pool 22.600 35.300 13.000 1.000 Y
Riffle 35.600 40.100 3.400 1.000 Y

* distance downstream (Dn) of benchmark

Habitat Unit Typebottom of habitat unit*top of habitat unit*length of habitat unit (m)% slopePhoto frame #
Riffle 0.000 27.100 26.500 1.000 Y
Pool 27.100 56.000 27.000 1.000 Y
Riffle 56.000 62.500 7.000 1.000 Y
Choose
Choose
Choose
Choose

Step 4.2 Longitudinal Survey, Habitat Quality

1. Streambed material (from 25 samples)
Fines: 20.00 %
Gravel: 44.00 %
Cobble: 36.00 %
Boulder: %
Bedrock: %
Cobble and Boulder Total: 0.00 %
2. % Embeddness 37.00 %
Instream cover
Large Woody debris: 62.00 pieces
Rooted cutbank: number of instances 38.00
4. Percent Pool Habitat
Survey Slope
Total length of pools:
Length of Reference Site: 99.8
Pool Habitat: %
5. Off Channel Habitat
Details: ~10 M IN LENGTHside channel seasonal
Size: 10m
Present: side
6. Bank Stability
Active Erosion Left Bank: 1
Active Erosion Left Bank Length: 4.10
Active Erosion Right Bank: 1
Active Erosion Right Bank Length: 10.60
Bank Stabilzation Left Bank:
Bank Stabilzation Left Bank Length:
Bank Stabilzation Right Bank:
Bank Stabilzation Right Bank Length:
Slides Reaching Channel Left Bank: 1
Slides Reaching Channel Left Bank Length: 1.35
Slides Reaching Channel Right Bank: 0
Slides Reaching Channel Right Bank Length:
7. Length of bank with no vegetation (m)
Left Bank: 15.80
Right Bank: 0.00
8. Overhead Canopy
Bankfull Channel covered by overhanging branches: 25.00 %
9. Riparian zone
# of channel widths: 10.00
Coniferous trees: 0.5
Deciduous trees: 0.5
Shrubs: 0.5
Grass: 0.25
Adjacent Land Use and Impacts:
Forest are - logging picnic area - boat access