Module 2 - Longitudinal Survey

Stream Name: CROSS CREEK Survey Date: 2012-09-20
Organization Name: Lake Babine Nation Project Name:
Stream Segment #: Stream Section #:
Data Entered by: Leanne Miranda Survey ID: 30

Step 4.1 Longitudinal Survey, Measurements

Length of Survey Site Minimum: 90.000 (m) Actual: 120.000 (m) Photos Taken? no
Upstream Survey Boundary Minimum: 45.000 (m) Actual:49.000 (m) Photos Taken? no
Downstream Survey Boundary Minimum: 45.000 (m) Actual: 71.000(m) Photos Taken? no

* distance upstream (Up) of benchmark

Habitat Unit Typebottom of habitat unit*top of habitat unit*length of habitat unit (m)% slopePhoto frame #
Pool 4.400 1.000
Riffle 6.530 4.000
Pool 5.300 2.000
Riffle 6.800 3.000
Pool 4.000 1.000
Riffle 7.000 4.000
Pool 13.200 1.000
Choose
Choose
Choose
Choose
Choose
Choose

* distance downstream (Dn) of benchmark

Habitat Unit Typebottom of habitat unit*top of habitat unit*length of habitat unit (m)% slopePhoto frame #
Riffle 6.350 1.000
Pool 5.600 0.000
Riffle 4.450 2.000
Pool 10.050 0.000
Pool 14.600 0.000
Riffle 18.930 2.000
Choose
Choose
Choose
Choose
Choose
Choose
Choose

Step 4.2 Longitudinal Survey, Habitat Quality

1. Streambed material (from 25 samples)
Fines: 16.00 %
Gravel: 68.00 %
Cobble: 16.00 %
Boulder: %
Bedrock: %
Cobble and Boulder Total: 0.00 %
2. % Embeddness 58.00 %
Instream cover
Large Woody debris: 30.00 pieces
Rooted cutbank: number of instances 82.00
4. Percent Pool Habitat
Survey Slope
Total length of pools:
Length of Reference Site: 107.21
Pool Habitat: %
5. Off Channel Habitat
Details:
Size:
Present: none
6. Bank Stability
Active Erosion Left Bank: 0
Active Erosion Left Bank Length:
Active Erosion Right Bank: 0
Active Erosion Right Bank Length:
Bank Stabilzation Left Bank: 0
Bank Stabilzation Left Bank Length:
Bank Stabilzation Right Bank: 0
Bank Stabilzation Right Bank Length:
Slides Reaching Channel Left Bank: 0
Slides Reaching Channel Left Bank Length:
Slides Reaching Channel Right Bank: 0
Slides Reaching Channel Right Bank Length:
7. Length of bank with no vegetation (m)
Left Bank: 0.00
Right Bank: 0.00
8. Overhead Canopy
Bankfull Channel covered by overhanging branches: 70.00 %
9. Riparian zone
# of channel widths: 10.00
Coniferous trees: 0.25
Deciduous trees: 0.5
Shrubs: 0.5
Grass: 0.5
Adjacent Land Use and Impacts:
road crossing with culvert about 550 m from mouth