Module 2 - Longitudinal Survey
Stream Name: LIZARD CREEK |
Survey Date: 2014-10-05 |
Organization Name: Elk River Alliance |
Project Name: CBWM-LC site 1 |
Stream Segment #: |
Stream Section #: |
Data Entered by: Ayla Bennett |
Survey ID: 48 |
Step 4.1 Longitudinal Survey, Measurements
Length of Survey Site |
Minimum: 114.000 (m) |
Actual: 114.000 (m) |
Photos Taken? yes |
Upstream Survey Boundary |
Minimum: 57.000 (m) |
Actual:57.000 (m) |
Photos Taken? yes |
Downstream Survey Boundary |
Minimum: 57.000 (m) |
Actual: 57.000(m) |
Photos Taken? yes |
* distance upstream (Up) of benchmark
Habitat Unit Type | bottom of habitat unit* | top of habitat unit* | length of habitat unit (m) | % slope | Photo frame # |
Riffle |
0.000 |
57.000 |
57.000 |
|
346 |
Not Recorded |
|
|
|
|
|
Not Recorded |
|
|
|
|
|
Not Recorded |
|
|
|
|
|
Not Recorded |
|
|
|
|
|
Not Recorded |
|
|
|
|
|
Not Recorded |
|
|
|
|
|
Not Recorded |
|
|
|
|
|
Not Recorded |
|
|
|
|
|
Not Recorded |
|
|
|
|
|
Not Recorded |
|
|
|
|
|
Not Recorded |
|
|
|
|
|
Not Recorded |
|
|
|
|
|
* distance downstream (Dn) of benchmark
Habitat Unit Type | bottom of habitat unit* | top of habitat unit* | length of habitat unit (m) | % slope | Photo frame # |
Riffle |
0.000 |
57.000 |
57.000 |
|
345 |
Not Recorded |
|
|
|
|
|
Not Recorded |
|
|
|
|
|
Not Recorded |
|
|
|
|
|
Not Recorded |
|
|
|
|
|
Not Recorded |
|
|
|
|
|
Not Recorded |
|
|
|
|
|
Not Recorded |
|
|
|
|
|
Not Recorded |
|
|
|
|
|
Not Recorded |
|
|
|
|
|
Not Recorded |
|
|
|
|
|
Not Recorded |
|
|
|
|
|
Not Recorded |
|
|
|
|
|
Step 4.2 Longitudinal Survey, Habitat Quality
1. Streambed material (from 25 samples) |
Fines: |
0.00 % |
Gravel: |
32.00 % |
Cobble: |
44.00 % |
Boulder: |
24.00 % |
Bedrock: |
0.00 % |
Cobble and Boulder Total: |
0.00 % |
2. % Embeddness |
5.00 % |
Instream cover |
Large Woody debris: |
1.00 pieces |
Rooted cutbank: |
number of instances 0.00 |
4. Percent Pool Habitat |
Survey Slope |
|
Total length of pools: |
|
Length of Reference Site: |
114 |
Pool Habitat: |
% |
5. Off Channel Habitat |
Details: |
|
Size: |
|
Present: |
none |
6. Bank Stability |
Active Erosion Left Bank: |
1 |
Active Erosion Left Bank Length: |
20.00 |
Active Erosion Right Bank: |
1 |
Active Erosion Right Bank Length: |
20.00 |
Bank Stabilzation Left Bank: |
|
Bank Stabilzation Left Bank Length: |
|
Bank Stabilzation Right Bank: |
1 |
Bank Stabilzation Right Bank Length: |
20.00 |
Slides Reaching Channel Left Bank: |
|
Slides Reaching Channel Left Bank Length: |
|
Slides Reaching Channel Right Bank: |
|
Slides Reaching Channel Right Bank Length: |
|
7. Length of bank with no vegetation (m) |
Left Bank: |
0.00 |
Right Bank: |
0.00 |
8. Overhead Canopy |
Bankfull Channel covered by overhanging branches: |
30.00 % |
9. Riparian zone |
# of channel widths: |
0.00 |
Coniferous trees: |
0.25 |
Deciduous trees: |
0.25 |
Shrubs: |
0.5 |
Grass: |
0.25 |
Adjacent Land Use and Impacts: highway, bridge downstream, forest |