Module 2 - Longitudinal Survey
Stream Name: MCMILLAN CREEK |
Survey Date: 2015-09-15 |
Organization Name: Prince George Streamkeepers |
Project Name: Streamkeepers Traini |
Stream Segment #: |
Stream Section #: |
Data Entered by: ZoAnn Morten |
Survey ID: 51 |
Step 4.1 Longitudinal Survey, Measurements
Length of Survey Site |
Minimum: (m) |
Actual: 0.000 (m) |
Photos Taken? no |
Upstream Survey Boundary |
Minimum: (m) |
Actual: (m) |
Photos Taken? no |
Downstream Survey Boundary |
Minimum: (m) |
Actual: (m) |
Photos Taken? no |
* distance upstream (Up) of benchmark
Habitat Unit Type | bottom of habitat unit* | top of habitat unit* | length of habitat unit (m) | % slope | Photo frame # |
Not Recorded |
|
|
|
|
|
Not Recorded |
|
|
|
|
|
Not Recorded |
|
|
|
|
|
Not Recorded |
|
|
|
|
|
Not Recorded |
|
|
|
|
|
Not Recorded |
|
|
|
|
|
Not Recorded |
|
|
|
|
|
Not Recorded |
|
|
|
|
|
Not Recorded |
|
|
|
|
|
Not Recorded |
|
|
|
|
|
Not Recorded |
|
|
|
|
|
Not Recorded |
|
|
|
|
|
Not Recorded |
|
|
|
|
|
* distance downstream (Dn) of benchmark
Habitat Unit Type | bottom of habitat unit* | top of habitat unit* | length of habitat unit (m) | % slope | Photo frame # |
Not Recorded |
|
|
|
|
|
Not Recorded |
|
|
|
|
|
Not Recorded |
|
|
|
|
|
Not Recorded |
|
|
|
|
|
Not Recorded |
|
|
|
|
|
Not Recorded |
|
|
|
|
|
Not Recorded |
|
|
|
|
|
Not Recorded |
|
|
|
|
|
Not Recorded |
|
|
|
|
|
Not Recorded |
|
|
|
|
|
Not Recorded |
|
|
|
|
|
Not Recorded |
|
|
|
|
|
Not Recorded |
|
|
|
|
|
Step 4.2 Longitudinal Survey, Habitat Quality
1. Streambed material (from 25 samples) |
Fines: |
% |
Gravel: |
% |
Cobble: |
% |
Boulder: |
% |
Bedrock: |
% |
Cobble and Boulder Total: |
0.00 % |
2. % Embeddness |
% |
Instream cover |
Large Woody debris: |
pieces |
Rooted cutbank: |
number of instances |
4. Percent Pool Habitat |
Survey Slope |
|
Total length of pools: |
|
Length of Reference Site: |
0 |
Pool Habitat: |
% |
5. Off Channel Habitat |
Details: |
|
Size: |
|
Present: |
none |
6. Bank Stability |
Active Erosion Left Bank: |
|
Active Erosion Left Bank Length: |
|
Active Erosion Right Bank: |
|
Active Erosion Right Bank Length: |
|
Bank Stabilzation Left Bank: |
|
Bank Stabilzation Left Bank Length: |
|
Bank Stabilzation Right Bank: |
|
Bank Stabilzation Right Bank Length: |
|
Slides Reaching Channel Left Bank: |
|
Slides Reaching Channel Left Bank Length: |
|
Slides Reaching Channel Right Bank: |
|
Slides Reaching Channel Right Bank Length: |
|
7. Length of bank with no vegetation (m) |
Left Bank: |
|
Right Bank: |
|
8. Overhead Canopy |
Bankfull Channel covered by overhanging branches: |
% |
9. Riparian zone |
# of channel widths: |
|
Coniferous trees: |
0 |
Deciduous trees: |
0 |
Shrubs: |
0 |
Grass: |
0 |
Adjacent Land Use and Impacts:
|