Module 3 Conditions and Location
Survey Location
Stream Name: BYRNE CREEK | Survey Date: 2013-08-21 |
Organization Name: Byrne Creek Streamkeepers | Project: Site 2 at Tag 516 |
Data entered by: ZoAnn Morten | Survey ID: 32 |
Watershed Code: | Stream Segment #: |
Contact Name: Paul Cipywnyk | Contact Phone: |
Survey Location
Start Time: 10:00:00 | End Time: 11:00:00 |
Mapsheet Number: | Mapsheet Type: Mapsheet Type: |
Latitude: | Longitude: |
Sampling Location (distance from known stream landmark, directions to location): The downstream end of the sediment pond, there was a think growth of algae. This would be expected to raise the DO during the day, due to photosynthesis, and to lower DO at night due to decay of dead plant material. |
|
Weather Description: Clear | Turbidity: |
Water Temperature: 16.00 | Air Temperature: |
Wetted Channel Width: | Average Wetted Channel Depth: 0.000 |
Bankfull Channel Width: | Average Bankful Channel Depth: 0.000 |
First and Last Measurements Taken .1m from the streambank edge
Left Bank |
0.10 | Right Bank | Wetted Depth |
Wetted Depth |
||||||||||||
Bankfull Depth |
Bankfull Depth |