Module 1 Action Items for Mallett Creek Survey # 102
Stream Name Survey Date Organization Project Name Survey ID Data Entered By
Mallett Creek 2018-07-26 Gabriola Streamkeepers Streamkeepers Module 102 ZoAnn Morten
ID
1287
Feature #
1
From Last
-0.40
Type
Enhancement-Log/Rock weir, Fishway
Size
Bank
Across
Adjacent Land Use
Undisturbed
Description:
Old homemade rock weir logs and rock with balck plastic Rock size ~ 0.50m looks to be made by hand not machin
Action Items:
Tidal area - this plastic is falling apart. Group could come and cut down the excess plastic area above the weir looks to be open to restoration work
ID
1288
Feature #
2
From Last
37.9
Type
Obstruction-Log Jam
Size
Bank
Across
Adjacent Land Use
Undisturbed
Description:
debris pile of logs
Action Items:
Keep an eye on this that the stream can continue to flow through easily - appears to be a barrier to fish passage
ID
1289
Feature #
3
From Last
6.2
Type
Obstruction-Falls, Cascade, Canyon
Size
Bank
Across
Adjacent Land Use
Undisturbed
Description:
Rock barrier
Action Items:
ID
1290
Feature #
4
From Last
50.3
Type
Bank Erosion
Size
Bank
Mid-stream
Adjacent Land Use
Undisturbed
Description:
Corrugated steel culvert under Taylor Bay Road H=0.91 W=0.91 no length measurement taken as too small to go through and busy road (ferry traffic) a
Action Items:
Corrugated steel culvert under Taylor Bay Road Culvert is in steep bouldery setting and perched this is the end point for section one, no measuremen
Records 1 to 4 of 4