Module 1 Action Items for Mallett Creek Survey # 103
Stream Name Survey Date Organization Project Name Survey ID Data Entered By
Mallett Creek 2018-07-26 Gabriola Streamkeepers Streamkeepers Module 103 ZoAnn Morten
ID
1291
Feature #
1
From Last
0.01
Type
Obstruction-Culvert
Size
Bank
Mid-stream
Adjacent Land Use
Undisturbed
Description:
Upstream end of Taylor Bay Road culvert H=0.93.5 W= 0.90
Action Items:
in the middle of pipe under the road the pipe is slightly suppressed. Bits of debris in the pipe
ID
1292
Feature #
2
From Last
16.7
Type
Modification-Other
Size
Bank
Left
Adjacent Land Use
Undisturbed
Description:
Slumping bank L= 2.35 H= 0.97
Action Items:
This is downstream of the old old footbridge Doesnt appear to be failing quickly just something to keep an eye on if more disturbances more activity i
ID
1293
Feature #
3
From Last
1.4
Type
Modification-Bridge
Size
Bank
Mid-stream
Adjacent Land Use
Undisturbed
Description:
Old old footbridge water depth is 0.18 width of opening in the lowest logs is 0.75 This bridge is made of logs, bottom two are placed upstream to do
Action Items:
Bridge is in decent condition and seems to accommodate current flow rates. Watch if flow rates increase as there is not a large opening for flows to g
ID
1294
Feature #
4
From Last
10.5
Type
Water Withdrawal-Screened Intake
Size
Bank
Across
Adjacent Land Use
Undisturbed
Description:
4 inch white PVC visible across stream buried both ends
Action Items:
NOTE needs to be investigated as to where the flows in pipe are coming from or going to still in use water or ... look up well info leaking, sagging
ID
1295
Feature #
5
From Last
24.9
Type
Obstruction-Falls, Cascade, Canyon
Size
Bank
Across
Adjacent Land Use
Undisturbed
Description:
fish barruer boulder w=2.2 h = 1.2
Action Items:
Records 1 to 5 of 5