|
ID 271 |
Feature # 1 |
From Last 0 |
Type other |
Size
|
Bank right |
Adjacent Land Use Commercial |
Description:
mouth of hoy creek mainstream |
Action Items:
leeching from auto wreckers. |
|
|
ID 272 |
Feature # 2 |
From Last 16.5 |
Type dredging, channelization, retaining wall, instream |
Size 107m x 2.4 |
Bank right |
Adjacent Land Use Commercial |
Description:
concrete wall, channel is confined |
Action Items:
storm water runoff, 0m setback, no riparian vegetation |
|
|
ID 273 |
Feature # 3 |
From Last 34.5 |
Type culvert |
Size
|
Bank right |
Adjacent Land Use Commercial |
Description:
15 cm storm drain outfall, 1m from substrate |
Action Items:
water quality from parking lot, autobody. |
|
|
ID 274 |
Feature # 4 |
From Last 4 |
Type rip-rap |
Size
|
Bank right |
Adjacent Land Use Commercial |
Description:
erosion on left bank for 25m, storm drain 15cm x 1m |
Action Items:
water quality from auto body and adjacent auto wreckers leeching. |
|
|
ID 275 |
Feature # 5 |
From Last 10 |
Type human induced, natural phenomenon,
other |
Size
|
Bank across |
Adjacent Land Use Commercial |
Description:
.2cm pipe crossing, 1.6m from sub |
Action Items:
rusty, damaged, possible water quality concerns. |
|
|
ID 276 |
Feature # 6 |
From Last 17 |
Type culvert |
Size 3.1m x 11. |
Bank across |
Adjacent Land Use Commercial |
Description:
3 box culverts under aberdeen st, LB side not flowing, sand deposit. |
Action Items:
2 pipe line crossing.
dia .3m. |
|
|
ID 277 |
Feature # 7 |
From Last 53 |
Type log/rock weir, fishway |
Size
|
Bank across |
Adjacent Land Use Commercial |
Description:
flood plain RB, LB black berry, rock weir confines channel |
Action Items:
invasive plant removal, add to habitat instream rootwads? car was from dealership |
|
|
ID 278 |
Feature # 8 |
From Last 44 |
Type culvert |
Size 3.1m x 11.5 |
Bank across |
Adjacent Land Use Commercial |
Description:
box culvert at lougheed hiway, middle culvert blocked with sand, right side culvert has weirs working |
Action Items:
debris removal req'd on down stream side of culbert, re-establish flow to all 3 culverts. |
|
|
ID 279 |
Feature # 9 |
From Last 4 |
Type culvert |
Size .25 diameter |
Bank right |
Adjacent Land Use Undisturbed |
Description:
presently no flow |
Action Items:
storm water quality? |
|