|
ID 711 |
Feature # 1 |
From Last 0 |
Type Modification-Rip-rap |
Size length 98.5 rocks ~ 2 m in size |
Bank Left |
Adjacent Land Use Commercial |
Description:
Rip Rap |
Action Items:
Highway / Ocean land useThis is tidal area |
|
|
ID 712 |
Feature # 2 |
From Last 3.4 |
Type Modification-Rip-rap |
Size L=12.9 H= 8.9 ~ 0.5 - 1.0m in size |
Bank Right |
Adjacent Land Use Commercial |
Description:
|
Action Items:
Iron content? |
|
|
ID 713 |
Feature # 3 |
From Last 7.7 |
Type Modification-Bridge |
Size w=3.4 |
Bank Across |
Adjacent Land Use Industrial |
Description:
Railway bridge |
Action Items:
Stainline is 3/4's of the way up the centre span support |
|
|
ID 714 |
Feature # 4 |
From Last 8.05 |
Type Modification-Bridge |
Size w= 9.0 |
Bank Across |
Adjacent Land Use Commercial |
Description:
Highway bridge |
Action Items:
see flood study done in WMG 2002there are 14 3" drains |
|
|
ID 715 |
Feature # 5 |
From Last 4.3 |
Type Modification-Rip-rap |
Size H=8.8 |
Bank Right |
Adjacent Land Use Commercial |
Description:
|
Action Items:
stainline is at 2.8 metres from bottom of rip rap |
|
|
ID 716 |
Feature # 6 |
From Last 9 |
Type Modification-Other |
Size 0.80 m across |
Bank Right |
Adjacent Land Use Undisturbed |
Description:
small foot path |
Action Items:
Not a party spot |
|
|
ID 717 |
Feature # 7 |
From Last 24.3 |
Type Discharge Pipe-Industrial Outfall |
Size
|
Bank Left |
Adjacent Land Use Industrial |
Description:
|
Action Items:
pipe from mine (4100 Portal) concern - yes |
|
|
ID 718 |
Feature # 8 |
From Last .05 |
Type Bank Erosion |
Size building is 10x10 |
Bank Right |
Adjacent Land Use Undisturbed |
Description:
sewage pump house |
Action Items:
sewage pump house out buildingright at top of bank |
|
|
ID 719 |
Feature # 9 |
From Last 15.7 |
Type Bank Erosion |
Size 2.3 m above stream, 0.23 diameter |
Bank Across |
Adjacent Land Use Undisturbed |
Description:
sewage pipe |
Action Items:
sewage pipewatch this and read flood report |
|
|
ID 720 |
Feature # 10 |
From Last 0.0005 |
Type Modification-Bridge |
Size w=104 |
Bank Both |
Adjacent Land Use Commercial |
Description:
footbridge - community bridge from shops to town |
Action Items:
see flood reportAlage |
|
|
ID 721 |
Feature # 11 |
From Last 0.0005 |
Type Modification-Other |
Size
|
Bank Both |
Adjacent Land Use Commercial |
Description:
waterline attached to the footbridge |
Action Items:
High above the substrate |
|
|
ID 722 |
Feature # 12 |
From Last 48.3 |
Type Modification-Other |
Size
|
Bank Acorss |
Adjacent Land Use Undisturbed |
Description:
this is where we took cross section |
Action Items:
|
|
|
ID 723 |
Feature # 13 |
From Last 0.05 |
Type Modification-Other |
Size .08 |
Bank Left |
Adjacent Land Use Undisturbed |
Description:
small footpath |
Action Items:
|
|
|
ID 724 |
Feature # 14 |
From Last 22.2 |
Type Bank Erosion |
Size L=128.7 |
Bank Left |
Adjacent Land Use Undisturbed |
Description:
|
Action Items:
|
|
|
ID 725 |
Feature # 15 |
From Last 22.2 |
Type Bank Erosion |
Size L=128.7 H= 1.4 |
Bank Left |
Adjacent Land Use Undisturbed |
Description:
|
Action Items:
eroding as wellorange stain - leaching? |
|
|
ID 726 |
Feature # 16 |
From Last 40 |
Type Bank Erosion |
Size L= 27.9 |
Bank Right |
Adjacent Land Use Undisturbed |
Description:
marked on page as Feature 15and information written on sheet isn't listed as no feature number was givenbetween feature number 14 and feature num |
Action Items:
|
|
|
ID 727 |
Feature # 17 |
From Last 152. |
Type Bank Erosion |
Size
|
Bank Left |
Adjacent Land Use Undisturbed |
Description:
|
Action Items:
|
|
|
ID 728 |
Feature # 18 |
From Last 152.7 |
Type Modification-Other |
Size L= 3.6 W= 1.8 |
Bank Mid-stream |
Adjacent Land Use Undisturbed |
Description:
concrete slabmarked on page as Feature 16 |
Action Items:
Big boulders jamming behindLots of surveyors string here |
|
|
ID 729 |
Feature # 19 |
From Last 44.8 |
Type Modification-Other |
Size
|
Bank Left |
Adjacent Land Use Undisturbed |
Description:
marked on page as Feature 17pin in rock and wood stake flag tape on top |
Action Items:
from flood plan? |
|
|
ID 730 |
Feature # 20 |
From Last 51.5 |
Type Modification-Other |
Size L=29.4 H=1.2 |
Bank Left |
Adjacent Land Use Undisturbed |
Description:
marked on page as Feature 18no clear record of what this feature is |
Action Items:
slumping hot spotsalgaerailway rails discarded in area |
|
|
ID 731 |
Feature # 21 |
From Last 29.4 |
Type Modification-Rip-rap |
Size l= 18.4 ~ 2m diameter |
Bank Right |
Adjacent Land Use Undisturbed |
Description:
|
Action Items:
|
|
|
ID 732 |
Feature # 22 |
From Last 17.8 |
Type Modification-Bridge |
Size L-5.8 |
Bank Across |
Adjacent Land Use Undisturbed |
Description:
marked on page as Feature 20single lane bridge copper drive road |
Action Items:
Dripping creosote garbage being thrown off bridge (beer cans) |
|
|
ID 733 |
Feature # 23 |
From Last 0.005 |
Type Modification-Rip-rap |
Size H=5.4 L= 7m ~ 2 m in diameter |
Bank Left |
Adjacent Land Use Undisturbed |
Description:
marked on page as Feature 21 |
Action Items:
|
|
|
ID 734 |
Feature # 24 |
From Last 7 |
Type Modification-Other |
Size
|
Bank Right |
Adjacent Land Use Undisturbed |
Description:
staff gaugemarked on page as Feature 21 |
Action Items:
reading 0 bottom is wet |
|
|
ID 735 |
Feature # 25 |
From Last 8.9 |
Type Bank Erosion |
Size L = 2 m H= ~ 5m |
Bank Right |
Adjacent Land Use Undisturbed |
Description:
marked on page as Feature 22 |
Action Items:
white substanceunnatural?PT went up to top of bank saw trib / ditch (paint?) |
|
|
ID 736 |
Feature # 26 |
From Last 1 |
Type Modification-Other |
Size
|
Bank Left |
Adjacent Land Use Undisturbed |
Description:
marked on page as Feature 231 1/2" cable holding pipe |
Action Items:
Environment canada monitoring?get data :>) |
|
|
ID 737 |
Feature # 27 |
From Last 80.2 |
Type WATERBODY-Tributary, wetland, ditch, other |
Size
|
Bank Left |
Adjacent Land Use Undisturbed |
Description:
Marked on data form as feature number 24 |
Action Items:
ephemeral streambringing organics to streamdry today |
|