Advanced Stream Habitat Survey Data Sheet - Module 2
Stream Name: SHILLESTEAD BROOK |
Survey Date: 2016-09-21 |
Organization Name: UNBC |
Project Name: Sk's training |
Stream Segment #: |
Stream Section #: |
Data entered by: Zo Ann Morten |
Survey ID: 65 |
Step 1 BENCHMARK LOCATION
Directions to Benchmark: 37.7 m downstream of culvert under logging road Streglar Pit Road Vanderhoof BC
Recommend wearing a high visibility vest in this area as active grouse and moose hunting |
Step 2 CROSS-SECTIONAL SURVEY
Latitude: 54.07790 |
Longitude: -124.00400 |
Location relative to benchmark: @ |
Photos Taken? yes |
Bankfull Channel Width: 2.97 |
Average Bankfull Depth: 11.40 |
Wetted Channel Width: 1.40 |
Average Wetted Depth: 8.92 |
Measurements taken every 0.50 metres |
Number of measurements taken: 10
|
First and Last Measurements Taken .1m from the streambank edge
Left Bank |
0.10 |
0.50 |
1.00 |
1.50 |
2.00 |
2.20 |
2.40 |
2.60 |
2.80 |
2.87 |
|
|
|
|
|
Right Bank |
Wetted Depth |
|
|
|
|
9.00 |
2.00 |
11.00 |
13.50 |
12.00 |
6.00 |
|
|
|
|
|
Wetted Depth |
Bankfull Depth |
8.00 |
3.00 |
5.00 |
5.00 |
16.00 |
8.00 |
17.00 |
19.00 |
19.00 |
14.00 |
|
|
|
|
|
Bankfull Depth |
Step 3 CALCULATE DISCHARGE
Cross-sectional area of wetted stream (m2) |
Discharge Wetted Width: 1.400 |
Discharge Average Depth: 0.090 |
= 0.126 |
Average Time (sec) |
18.000 |
20.000 |
20.000 |
22.000 |
19.000 |
99 |
|
19.80 |
Trial 1 |
Trial 2 |
Trial 3 |
Trial 4 |
Trial 5 |
Total Trials |
/ 5 |
Average Time |
Average Velocity (sec) |
8.000 |
19.80 |
0.404 |
Length (m) |
Average Time (sec) |
Average Velocity (m/sec) |
Average Stream Discharge (m3/sec) |
0.12600 |
0.40404 |
x 0.8 |
0.00407 |
Cross sectional area (m2) |
Average velocity (m/sec) |
correction factor |
Discharge (m3/sec) |