Advanced Stream Habitat Survey Data Sheet - Module 2
Stream Name: MACKAY CREEK |
Survey Date: 2019-07-14 |
Organization Name: PSKF |
Project Name: Streamkeepers training |
Stream Segment #: 1 |
Stream Section #: |
Data entered by: ZoAnn |
Survey ID: 96 |
Step 1 BENCHMARK LOCATION
Directions to Benchmark: Same as cross section 19.9 m d/s of footbridge |
Step 2 CROSS-SECTIONAL SURVEY
Latitude: 49.33078 |
Longitude: -123.10020 |
Location relative to benchmark: @ |
Photos Taken? yes |
Bankfull Channel Width: 5.70 |
Average Bankfull Depth: 35.17 |
Wetted Channel Width: 4.15 |
Average Wetted Depth: 8.52 |
Measurements taken every 1.00 metres |
Number of measurements taken: 7
|
First and Last Measurements Taken .1m from the streambank edge
Left Bank |
0.10 |
1.00 |
2.00 |
3.00 |
4.00 |
5.00 |
5.50 |
|
|
|
|
|
|
|
|
Right Bank |
Wetted Depth |
0.06 |
22.00 |
0.00 |
12.00 |
|
|
|
|
|
|
|
|
|
|
|
Wetted Depth |
Bankfull Depth |
34.00 |
53.00 |
33.00 |
45.00 |
21.00 |
25.00 |
|
|
|
|
|
|
|
|
|
Bankfull Depth |
Step 3 CALCULATE DISCHARGE
Cross-sectional area of wetted stream (m2) |
Discharge Wetted Width: 4.150 |
Discharge Average Depth: 0.080 |
= 0.332 |
Average Time (sec) |
36.000 |
23.000 |
19.000 |
17.000 |
18.000 |
113 |
|
22.60 |
Trial 1 |
Trial 2 |
Trial 3 |
Trial 4 |
Trial 5 |
Total Trials |
/ 5 |
Average Time |
Average Velocity (sec) |
10.000 |
22.60 |
0.442 |
Length (m) |
Average Time (sec) |
Average Velocity (m/sec) |
Average Stream Discharge (m3/sec) |
0.33200 |
0.44248 |
x 0.8 |
0.01175 |
Cross sectional area (m2) |
Average velocity (m/sec) |
correction factor |
Discharge (m3/sec) |