Advanced Stream Habitat Survey Data Sheet - Module 2
Step 5 LONGITUDINAL SURVEY, MEASUREMENTS
Length of Survey Site |
Minimum: 60.000 (m) |
Actual: 62.000 (m) |
Photos Taken? yes |
Upstream Survey Boundary |
Minimum: 60.000 (m) |
Actual:15.000 (m) |
Photos Taken? yes |
Downstream Survey Boundary |
Minimum: 60.000 (m) |
Actual: 47.000(m) |
Photos Taken? no |
No Upstream Habitats Entered.
No Downstream Habitats Entered.
Step 5 HABITAT CHARACTERISTICS
1. Streambed material (from 25 samples) |
Fines: |
8.00 % |
Gravel: |
12.00 % |
Cobble: |
70.00 % |
Boulder: |
10.00 % |
Bedrock: |
0.00 % |
Cobble and Boulder Total: |
0.00 % |
2. % Embeddness |
0.00 % |
Instream cover |
Large Woody debris: |
9.00 pieces |
Rooted cutbank: |
number of instances 11.00 |
4. Percent Pool Habitat |
Average % Survey Slope |
% |
Total length of pools: |
37.2 |
Length of Reference Site: |
70.5 |
Pool Habitat: |
52.77% |
5. Off Channel Habitat |
Details: |
none |
Size: |
19.4 |
Present: |
side |
6. Bank Stability |
Active Erosion Left Bank: |
27. |
Active Erosion Left Bank Length: |
12.00 |
Active Erosion Right Bank: |
1.4 |
Active Erosion Right Bank Length: |
14.00 |
Bank Stabilzation Left Bank: |
8.4 |
Bank Stabilzation Left Bank Length: |
0.00 |
Bank Stabilzation Right Bank: |
14. |
Bank Stabilzation Right Bank Length: |
0.00 |
Slides Reaching Channel Left Bank: |
n/a |
Slides Reaching Channel Left Bank Length: |
0.00 |
Slides Reaching Channel Right Bank: |
n/a |
Slides Reaching Channel Right Bank Length: |
0.00 |
7. Length of bank with no vegetation (m) |
Left Bank: |
0.00 |
Right Bank: |
0.00 |
8. Overhead Canopy |
Bankfull Channel covered by overhanging branches: |
96.00 % |
9. Riparian zone |
# of channel widths: |
3.00 |
Coniferous trees: |
few |
Deciduous trees: |
many |
Shrubs: |
many |
Grass: |
few |
Adjacent Land Use and Impacts: Monteith road, a lot of gardens on both sides, private yards at d/s end.
Erosion, stormwater flooding, stormdrain culvert very long u/s - big pool formed. Stream bank hardening - concrete sand bags - |