Advanced Stream Habitat Survey Data Sheet - Module 2
Step 5 LONGITUDINAL SURVEY, MEASUREMENTS
Length of Survey Site Minimum: 48.000 (m) Actual: 47.000 (m) Photos Taken? yes
Upstream Survey Boundary Minimum: 24.000 (m) Actual:23.000 (m) Photos Taken? yes
Downstream Survey Boundary Minimum: 24.000 (m) Actual: 23.000(m) Photos Taken? yes

* distance upstream (Up) of benchmark

Habitat Unit Type bottom of habitat unit* top of habitat unit* length of habitat unit (m) % slope Photo frame #
Riffle 0.000 1.100 1.000 0.000
Pool 1.100 2.200 1.900 0.000
Riffle 2.200 2.700 1.000 23.000
Pool 2.700 3.600 1.800 0.000
Riffle 3.600 4.700 1.100 5.000
Pool 4.700 6.700 2.200 2.000
Riffle 6.700 8.300 1.300 20.000
Pool 8.300 10.200 2.100 0.000
Riffle 10.200 11.400 1.000 8.000
Pool 11.400 12.300 0.800 0.000
Riffle 12.300 23.000 11.700 15.000
Pool 0.000 0.000 0.000 0.000
Pool 0.000 0.000 0.000 0.000

* distance downstream (Dn) of benchmark

Habitat Unit Type bottom of habitat unit* top of habitat unit* length of habitat unit (m) % slope Photo frame #
Riffle 0.000 10.000 9.700 15.000
Pool 10.000 13.600 3.600 0.000
Riffle 13.600 14.400 0.700 2.000
Pool 14.400 16.600 2.850 0.000
Riffle 16.600 24.000 8.100 2.000
Pool 0.000 0.000 0.000 0.000
Pool 0.000 0.000 0.000 0.000
Pool 0.000 0.000 0.000 0.000
Pool 0.000 0.000 0.000 0.000
Pool 0.000 0.000 0.000 0.000
Pool 0.000 0.000 0.000 0.000
Pool 0.000 0.000 0.000 0.000
Pool 0.000 0.000 0.000 0.000
Step 5 HABITAT CHARACTERISTICS
1. Streambed material (from 25 samples)
Fines: 48.00 %
Gravel: 24.00 %
Cobble: 12.00 %
Boulder: 16.00 %
Bedrock: 0.00 %
Cobble and Boulder Total: 0.00 %
2. % Embeddness 40.00 %
Instream cover 0.00
Large Woody debris: 8.00 pieces
Rooted cutbank: number of instances 1.00
4. Percent Pool Habitat
Average % Survey Slope 3.54 %
Total length of pools: 15.25
Length of Reference Site: 50.85
Pool Habitat: 29.99 %
5. Off Channel Habitat
Details:
Size:
Present: none
6. Bank Stability
Active Erosion Left Bank: 2
Active Erosion Left Bank Length: 20.20
Active Erosion Right Bank:
Active Erosion Right Bank Length: 0.00
Bank Stabilzation Left Bank:
Bank Stabilzation Left Bank Length: 0.00
Bank Stabilzation Right Bank:
Bank Stabilzation Right Bank Length: 0.00
Slides Reaching Channel Left Bank:
Slides Reaching Channel Left Bank Length: 0.00
Slides Reaching Channel Right Bank:
Slides Reaching Channel Right Bank Length: 0.00
7. Length of bank with no vegetation (m)
Left Bank: 17.20
Right Bank: 0.00
8. Overhead Canopy
Bankfull Channel covered by overhanging branches: 75.00 %
9. Riparian zone
# of channel widths: 0.00
Coniferous trees: few
Deciduous trees: many
Shrubs: many
Grass: few
Adjacent Land Use and Impacts:
Walking trail, mineral claim (sluice box)