Advanced Stream Habitat Survey Data Sheet - Module 2
Step 5 LONGITUDINAL SURVEY, MEASUREMENTS
Length of Survey Site Minimum: 84.000 (m) Actual: 84.000 (m) Photos Taken? no
Upstream Survey Boundary Minimum: 42.000 (m) Actual:0.000 (m) Photos Taken? yes
Downstream Survey Boundary Minimum: 0.000 (m) Actual: 0.000(m) Photos Taken? yes

* distance upstream (Up) of benchmark

Habitat Unit Type bottom of habitat unit* top of habitat unit* length of habitat unit (m) % slope Photo frame #
Pool 0.000 0.000 0.000 0.000 1636
Riffle 0.000 0.000 0.000 0.000
Pool 0.000 0.000 0.000 0.000
Riffle 0.000 0.000 0.000 0.000
Pool 0.000 0.000 0.000 0.000
Riffle 0.000 0.000 0.000 0.000
Pool 0.000 0.000 0.000 0.000
Riffle 0.000 0.000 0.000 0.000
Pool 0.000 0.000 0.000 0.000
Pool 0.000 0.000 0.000 0.000
Pool 0.000 0.000 0.000 0.000
Pool 0.000 0.000 0.000 0.000
Pool 0.000 0.000 0.000 0.000

* distance downstream (Dn) of benchmark

Habitat Unit Type bottom of habitat unit* top of habitat unit* length of habitat unit (m) % slope Photo frame #
Riffle 0.000 0.000 0.000 0.000
Pool 0.000 0.000 0.000 0.000
Riffle 0.000 0.000 0.000 0.000
Pool 0.000 0.000 0.000 0.000
Riffle 0.000 0.000 0.000 0.000 5639
Pool 0.000 0.000 0.000 0.000
Riffle 0.000 0.000 0.000 0.000
Pool 0.000 0.000 0.000 0.000
Pool 0.000 0.000 0.000 0.000
Pool 0.000 0.000 0.000 0.000
Pool 0.000 0.000 0.000 0.000
Pool 0.000 0.000 0.000 0.000
Pool 0.000 0.000 0.000 0.000
Step 5 HABITAT CHARACTERISTICS
1. Streambed material (from 25 samples)
Fines: 4.00 %
Gravel: 44.00 %
Cobble: 36.00 %
Boulder: 16.00 %
Bedrock: 0.00 %
Cobble and Boulder Total: 0.00 %
2. % Embeddness 26.50 %
Instream cover 0.00
Large Woody debris: 11.00 pieces
Rooted cutbank: number of instances 2.00
4. Percent Pool Habitat
Average % Survey Slope 0.00 %
Total length of pools: 0
Length of Reference Site: 0
Pool Habitat: nan %
5. Off Channel Habitat
Details:
Size:
Present: none
6. Bank Stability
Active Erosion Left Bank:
Active Erosion Left Bank Length: 0.00
Active Erosion Right Bank: 1
Active Erosion Right Bank Length: 1.50
Bank Stabilzation Left Bank:
Bank Stabilzation Left Bank Length: 0.00
Bank Stabilzation Right Bank:
Bank Stabilzation Right Bank Length: 0.00
Slides Reaching Channel Left Bank:
Slides Reaching Channel Left Bank Length: 0.00
Slides Reaching Channel Right Bank:
Slides Reaching Channel Right Bank Length: 0.00
7. Length of bank with no vegetation (m)
Left Bank: 0.00
Right Bank: 1.50
8. Overhead Canopy
Bankfull Channel covered by overhanging branches: 30.00 %
9. Riparian zone
# of channel widths: 2.50
Coniferous trees: few
Deciduous trees: few
Shrubs: many
Grass: few
Adjacent Land Use and Impacts:
The area of bank erosion is due to small trail that goes into the creek on the right side of the creek is the walking trail on the left slope with main roadway above 60-70% invasive vegetation