Advanced Stream Habitat Survey Data Sheet - Module 2
Step 5 LONGITUDINAL SURVEY, MEASUREMENTS
Length of Survey Site |
Minimum: 124.800 (m) |
Actual: 126.500 (m) |
Photos Taken? no |
Upstream Survey Boundary |
Minimum: 62.400 (m) |
Actual:64.000 (m) |
Photos Taken? no |
Downstream Survey Boundary |
Minimum: 62.400 (m) |
Actual: 62.500(m) |
Photos Taken? no |
No Upstream Habitats Entered.
No Downstream Habitats Entered.
Step 5 HABITAT CHARACTERISTICS
1. Streambed material (from 25 samples) |
Fines: |
20.00 % |
Gravel: |
44.00 % |
Cobble: |
36.00 % |
Boulder: |
% |
Bedrock: |
% |
Cobble and Boulder Total: |
0.00 % |
2. % Embeddness |
37.00 % |
Instream cover |
Large Woody debris: |
62.00 pieces |
Rooted cutbank: |
number of instances 38.00 |
4. Percent Pool Habitat |
Average % Survey Slope |
% |
Total length of pools: |
51.8 |
Length of Reference Site: |
99.8 |
Pool Habitat: |
51.90% |
5. Off Channel Habitat |
Details: |
~10 M IN LENGTHside channel seasonal |
Size: |
10 |
Present: |
side |
6. Bank Stability |
Active Erosion Left Bank: |
1 |
Active Erosion Left Bank Length: |
4.10 |
Active Erosion Right Bank: |
1 |
Active Erosion Right Bank Length: |
10.60 |
Bank Stabilzation Left Bank: |
|
Bank Stabilzation Left Bank Length: |
|
Bank Stabilzation Right Bank: |
|
Bank Stabilzation Right Bank Length: |
|
Slides Reaching Channel Left Bank: |
1 |
Slides Reaching Channel Left Bank Length: |
1.35 |
Slides Reaching Channel Right Bank: |
0 |
Slides Reaching Channel Right Bank Length: |
|
7. Length of bank with no vegetation (m) |
Left Bank: |
15.80 |
Right Bank: |
0.00 |
8. Overhead Canopy |
Bankfull Channel covered by overhanging branches: |
25.00 % |
9. Riparian zone |
# of channel widths: |
10.00 |
Coniferous trees: |
0.5 |
Deciduous trees: |
0.5 |
Shrubs: |
0.5 |
Grass: |
0.25 |
Adjacent Land Use and Impacts: Forest are - logging picnic area - boat access |