Advanced Stream Habitat Survey Data Sheet - Module 2
Step 5 LONGITUDINAL SURVEY, MEASUREMENTS
Length of Survey Site |
Minimum: 147.600 (m) |
Actual: 144.000 (m) |
Photos Taken? no |
Upstream Survey Boundary |
Minimum: 73.800 (m) |
Actual:72.000 (m) |
Photos Taken? no |
Downstream Survey Boundary |
Minimum: 73.800 (m) |
Actual: 72.000(m) |
Photos Taken? no |
* distance upstream (Up) of benchmark
Habitat Unit Type |
bottom of habitat unit* |
top of habitat unit* |
length of habitat unit (m) |
% slope |
Photo frame # |
Riffle |
0.000 |
40.000 |
40.000 |
0.800 |
|
Pool |
40.000 |
60.000 |
20.000 |
0.000 |
|
Riffle |
60.000 |
72.000 |
12.000 |
0.800 |
|
Choose |
|
|
|
0 |
|
Choose |
|
|
|
0 |
|
Choose |
|
|
|
0 |
|
Choose |
|
|
|
0 |
|
Choose |
|
|
|
0 |
|
Choose |
|
|
|
0 |
|
Choose |
|
|
|
0 |
|
Choose |
|
|
|
0 |
|
Choose |
|
|
|
0 |
|
Choose |
|
|
|
0 |
|
* distance downstream (Dn) of benchmark
Habitat Unit Type |
bottom of habitat unit* |
top of habitat unit* |
length of habitat unit (m) |
% slope |
Photo frame # |
Riffle |
0.000 |
72.000 |
72.000 |
0.800 |
|
Choose |
|
|
|
0 |
|
Choose |
|
|
|
0 |
|
Choose |
|
|
|
0 |
|
Choose |
|
|
|
0 |
|
Choose |
|
|
|
0 |
|
Choose |
|
|
|
0 |
|
Choose |
|
|
|
0 |
|
Choose |
|
|
|
0 |
|
Choose |
|
|
|
0 |
|
Choose |
|
|
|
0 |
|
Choose |
|
|
|
0 |
|
Choose |
|
|
|
0 |
|
Step 5 HABITAT CHARACTERISTICS
1. Streambed material (from 25 samples) |
Fines: |
0.00 % |
Gravel: |
8.00 % |
Cobble: |
48.00 % |
Boulder: |
44.00 % |
Bedrock: |
0.00 % |
Cobble and Boulder Total: |
0.00 % |
2. % Embeddness |
25.00 % |
Instream cover |
Large Woody debris: |
2.00 pieces |
Rooted cutbank: |
number of instances 2.00 |
4. Percent Pool Habitat |
Average % Survey Slope |
0.60 % |
Total length of pools: |
20 |
Length of Reference Site: |
144 |
Pool Habitat: |
13.89 % |
5. Off Channel Habitat |
Details: |
|
Size: |
|
Present: |
none |
6. Bank Stability |
Active Erosion Left Bank: |
0 |
Active Erosion Left Bank Length: |
|
Active Erosion Right Bank: |
0 |
Active Erosion Right Bank Length: |
|
Bank Stabilzation Left Bank: |
0 |
Bank Stabilzation Left Bank Length: |
|
Bank Stabilzation Right Bank: |
0 |
Bank Stabilzation Right Bank Length: |
|
Slides Reaching Channel Left Bank: |
0 |
Slides Reaching Channel Left Bank Length: |
|
Slides Reaching Channel Right Bank: |
0 |
Slides Reaching Channel Right Bank Length: |
|
7. Length of bank with no vegetation (m) |
Left Bank: |
4.00 |
Right Bank: |
5.00 |
8. Overhead Canopy |
Bankfull Channel covered by overhanging branches: |
14.00 % |
9. Riparian zone |
# of channel widths: |
2.00 |
Coniferous trees: |
0.25 |
Deciduous trees: |
0.25 |
Shrubs: |
0.5 |
Grass: |
0.5 |
Adjacent Land Use and Impacts: Private land, highway 100 m downstream, new subdivision being constructed 1-2 km upstream ("The Cedars") |