Advanced Stream Habitat Survey Data Sheet - Module 2
Step 5 LONGITUDINAL SURVEY, MEASUREMENTS
Length of Survey Site |
Minimum: 144.000 (m) |
Actual: 156.600 (m) |
Photos Taken? yes |
Upstream Survey Boundary |
Minimum: 72.000 (m) |
Actual:78.000 (m) |
Photos Taken? yes |
Downstream Survey Boundary |
Minimum: 72.000 (m) |
Actual: 78.600(m) |
Photos Taken? yes |
No Upstream Habitats Entered.
No Downstream Habitats Entered.
Step 5 HABITAT CHARACTERISTICS
1. Streambed material (from 25 samples) |
Fines: |
12.00 % |
Gravel: |
36.00 % |
Cobble: |
40.00 % |
Boulder: |
12.00 % |
Bedrock: |
0.00 % |
Cobble and Boulder Total: |
0.00 % |
2. % Embeddness |
40.00 % |
Instream cover |
Large Woody debris: |
9.00 pieces |
Rooted cutbank: |
number of instances 11.00 |
4. Percent Pool Habitat |
Average % Survey Slope |
% |
Total length of pools: |
30.8 |
Length of Reference Site: |
156.6 |
Pool Habitat: |
19.67% |
5. Off Channel Habitat |
Details: |
10 m long, 1m wide, 0.2 m deep, muddy |
Size: |
10 |
Present: |
side |
6. Bank Stability |
Active Erosion Left Bank: |
0 |
Active Erosion Left Bank Length: |
0.00 |
Active Erosion Right Bank: |
2 |
Active Erosion Right Bank Length: |
50.00 |
Bank Stabilzation Left Bank: |
0 |
Bank Stabilzation Left Bank Length: |
0.00 |
Bank Stabilzation Right Bank: |
1 |
Bank Stabilzation Right Bank Length: |
20.00 |
Slides Reaching Channel Left Bank: |
0 |
Slides Reaching Channel Left Bank Length: |
0.00 |
Slides Reaching Channel Right Bank: |
0 |
Slides Reaching Channel Right Bank Length: |
0.00 |
7. Length of bank with no vegetation (m) |
Left Bank: |
0.00 |
Right Bank: |
50.00 |
8. Overhead Canopy |
Bankfull Channel covered by overhanging branches: |
40.00 % |
9. Riparian zone |
# of channel widths: |
1.00 |
Coniferous trees: |
0.5 |
Deciduous trees: |
0.25 |
Shrubs: |
0.25 |
Grass: |
0.5 |
Adjacent Land Use and Impacts: right bank: rifle range, gravel logging road, forestry
left bank: highway 3 (200 m from site 3), gravel parking lot |