Advanced Stream Habitat Survey Data Sheet - Module 2
Step 5 LONGITUDINAL SURVEY, MEASUREMENTS
Length of Survey Site Minimum: 109.000 (m) Actual: 120.000 (m) Photos Taken? yes
Upstream Survey Boundary Minimum: 55.000 (m) Actual:65.000 (m) Photos Taken? yes
Downstream Survey Boundary Minimum: 55.000 (m) Actual: 55.000(m) Photos Taken? yes
No Upstream Habitats Entered.
No Downstream Habitats Entered.
Step 5 HABITAT CHARACTERISTICS
1. Streambed material (from 25 samples)
Fines: 25.00 %
Gravel: 44.00 %
Cobble: 36.00 %
Boulder: 0.00 %
Bedrock: 0.00 %
Cobble and Boulder Total: 0.00 %
2. % Embeddness 10.00 %
Instream cover
Large Woody debris: 32.00 pieces
Rooted cutbank: number of instances 5.00
4. Percent Pool Habitat
Average % Survey Slope %
Total length of pools: 36.7
Length of Reference Site: 120
Pool Habitat: 30.58%
5. Off Channel Habitat
Details: seasonal side channel
Size:
Present: side
6. Bank Stability
Active Erosion Left Bank: 1
Active Erosion Left Bank Length: 5.00
Active Erosion Right Bank: 0
Active Erosion Right Bank Length: 0.00
Bank Stabilzation Left Bank: 2
Bank Stabilzation Left Bank Length: 60.00
Bank Stabilzation Right Bank: 0
Bank Stabilzation Right Bank Length: 0.00
Slides Reaching Channel Left Bank: 0
Slides Reaching Channel Left Bank Length: 0.00
Slides Reaching Channel Right Bank: 0
Slides Reaching Channel Right Bank Length: 0.00
7. Length of bank with no vegetation (m)
Left Bank: 0.00
Right Bank: 0.00
8. Overhead Canopy
Bankfull Channel covered by overhanging branches: 26.00 %
9. Riparian zone
# of channel widths: 0.00
Coniferous trees: 0.5
Deciduous trees: 0.25
Shrubs: 0.5
Grass: 0.5
Adjacent Land Use and Impacts:
Provincial Park, trail, campgournd, sewage facility, Island Lake Lodge upstream