Advanced Stream Habitat Survey Data Sheet - Module 2
Step 5 LONGITUDINAL SURVEY, MEASUREMENTS
Length of Survey Site Minimum: 102.000 (m) Actual: 128.800 (m) Photos Taken? no
Upstream Survey Boundary Minimum: 51.000 (m) Actual:79.400 (m) Photos Taken? no
Downstream Survey Boundary Minimum: 51.000 (m) Actual: 49.400(m) Photos Taken? no
No Upstream Habitats Entered.
No Downstream Habitats Entered.
Step 5 HABITAT CHARACTERISTICS
1. Streambed material (from 25 samples)
Fines: 4.00 %
Gravel: 76.00 %
Cobble: 20.00 %
Boulder: %
Bedrock: %
Cobble and Boulder Total: 0.00 %
2. % Embeddness 18.00 %
Instream cover
Large Woody debris: 11.00 pieces
Rooted cutbank: number of instances 19.00
4. Percent Pool Habitat
Average % Survey Slope %
Total length of pools: 31.65
Length of Reference Site: 126.95
Pool Habitat: 24.93%
5. Off Channel Habitat
Details:
Size:
Present: none
6. Bank Stability
Active Erosion Left Bank: 1
Active Erosion Left Bank Length: 15.20
Active Erosion Right Bank: 2
Active Erosion Right Bank Length: 20.09
Bank Stabilzation Left Bank: 2
Bank Stabilzation Left Bank Length: 7.30
Bank Stabilzation Right Bank: 3
Bank Stabilzation Right Bank Length: 49.20
Slides Reaching Channel Left Bank: 0
Slides Reaching Channel Left Bank Length: 0.00
Slides Reaching Channel Right Bank: 0
Slides Reaching Channel Right Bank Length: 0.00
7. Length of bank with no vegetation (m)
Left Bank: 10.90
Right Bank: 20.60
8. Overhead Canopy
Bankfull Channel covered by overhanging branches: 85.00 %
9. Riparian zone
# of channel widths: 3.00
Coniferous trees: 0.25
Deciduous trees: 0.5
Shrubs: 0.5
Grass: 0.25
Adjacent Land Use and Impacts:
right next to a playing field and play ground. Lots of activity all day and appears to be at night as well. Lots of booze bottles, dog doo and palying instream here. Next to mini hatchery for chum