Advanced Stream Habitat Survey Data Sheet - Module 2
Step 5 LONGITUDINAL SURVEY, MEASUREMENTS
Length of Survey Site Minimum: 312.000 (m) Actual: 160.000 (m) Photos Taken? yes
Upstream Survey Boundary Minimum: 156.000 (m) Actual:160.000 (m) Photos Taken? yes
Downstream Survey Boundary Minimum: 156.000 (m) Actual: 0.000(m) Photos Taken? no
No Upstream Habitats Entered.
No Downstream Habitats Entered.
Step 5 HABITAT CHARACTERISTICS
1. Streambed material (from 25 samples)
Fines: 8.00 %
Gravel: 36.00 %
Cobble: 48.00 %
Boulder: 8.00 %
Bedrock: 0.00 %
Cobble and Boulder Total: 0.00 %
2. % Embeddness 41.00 %
Instream cover
Large Woody debris: 27.00 pieces
Rooted cutbank: number of instances 15.00
4. Percent Pool Habitat
Average % Survey Slope %
Total length of pools: 115.8
Length of Reference Site: 161.5
Pool Habitat: 71.70%
5. Off Channel Habitat
Details: Small channels present during high water on right bank.
Size: 1
Present: seco
6. Bank Stability
Active Erosion Left Bank: 0
Active Erosion Left Bank Length: 0.00
Active Erosion Right Bank: 1
Active Erosion Right Bank Length: 4.20
Bank Stabilzation Left Bank: 0
Bank Stabilzation Left Bank Length: 0.00
Bank Stabilzation Right Bank: 0
Bank Stabilzation Right Bank Length: 0.00
Slides Reaching Channel Left Bank: 0
Slides Reaching Channel Left Bank Length: 0.00
Slides Reaching Channel Right Bank: 0
Slides Reaching Channel Right Bank Length: 0.00
7. Length of bank with no vegetation (m)
Left Bank: 0.00
Right Bank: 0.00
8. Overhead Canopy
Bankfull Channel covered by overhanging branches: 10.00 %
9. Riparian zone
# of channel widths: 2.00
Coniferous trees: 0.25
Deciduous trees: 0.5
Shrubs: 0.5
Grass: 0.5
Adjacent Land Use and Impacts:
Public lands with forestry road and bridge nearby. May be forestry activity in area.