Advanced Stream Habitat Survey Data Sheet - Module 2
Step 5 LONGITUDINAL SURVEY, MEASUREMENTS
Length of Survey Site |
Minimum: 32.500 (m) |
Actual: 41.500 (m) |
Photos Taken? no |
Upstream Survey Boundary |
Minimum: 32.500 (m) |
Actual:0.000 (m) |
Photos Taken? no |
Downstream Survey Boundary |
Minimum: 32.500 (m) |
Actual: 41.500(m) |
Photos Taken? no |
* distance upstream (Up) of benchmark
Habitat Unit Type |
bottom of habitat unit* |
top of habitat unit* |
length of habitat unit (m) |
% slope |
Photo frame # |
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
* distance downstream (Dn) of benchmark
Habitat Unit Type |
bottom of habitat unit* |
top of habitat unit* |
length of habitat unit (m) |
% slope |
Photo frame # |
Riffle |
0.000 |
7.900 |
8.500 |
1.000 |
|
Pool |
7.900 |
11.100 |
2.900 |
2.000 |
|
Riffle |
11.100 |
13.000 |
2.900 |
1.000 |
|
Pool |
13.000 |
14.500 |
1.600 |
2.000 |
|
Riffle |
14.500 |
41.500 |
27.000 |
2.500 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Step 5 HABITAT CHARACTERISTICS
1. Streambed material (from 25 samples) |
Fines: |
10.00 % |
Gravel: |
60.00 % |
Cobble: |
30.00 % |
Boulder: |
% |
Bedrock: |
% |
Cobble and Boulder Total: |
0.00 % |
2. % Embeddness |
20.00 % |
Instream cover |
Large Woody debris: |
9.00 pieces |
Rooted cutbank: |
number of instances 0.00 |
4. Percent Pool Habitat |
Average % Survey Slope |
1.70 % |
Total length of pools: |
4.5 |
Length of Reference Site: |
42.9 |
Pool Habitat: |
10.49 % |
5. Off Channel Habitat |
Details: |
side channel |
Size: |
14 |
Present: |
righ |
6. Bank Stability |
Active Erosion Left Bank: |
|
Active Erosion Left Bank Length: |
|
Active Erosion Right Bank: |
|
Active Erosion Right Bank Length: |
|
Bank Stabilzation Left Bank: |
1 |
Bank Stabilzation Left Bank Length: |
41.50 |
Bank Stabilzation Right Bank: |
1 |
Bank Stabilzation Right Bank Length: |
41.50 |
Slides Reaching Channel Left Bank: |
|
Slides Reaching Channel Left Bank Length: |
|
Slides Reaching Channel Right Bank: |
|
Slides Reaching Channel Right Bank Length: |
|
7. Length of bank with no vegetation (m) |
Left Bank: |
12.90 |
Right Bank: |
12.90 |
8. Overhead Canopy |
Bankfull Channel covered by overhanging branches: |
85.00 % |
9. Riparian zone |
# of channel widths: |
2.00 |
Coniferous trees: |
0.25 |
Deciduous trees: |
0.5 |
Shrubs: |
0.25 |
Grass: |
0.5 |
Adjacent Land Use and Impacts: This is in the park engineered stream, flow comes from Deer lake. we could only go downstream 41.5 as there is a chain link fence across the creek |