Advanced Stream Habitat Survey Data Sheet - Module 2
Step 5 LONGITUDINAL SURVEY, MEASUREMENTS
Length of Survey Site Minimum: 97.200 (m) Actual: 108.400 (m) Photos Taken? yes
Upstream Survey Boundary Minimum: 48.600 (m) Actual:56.800 (m) Photos Taken? yes
Downstream Survey Boundary Minimum: 48.600 (m) Actual: 51.600(m) Photos Taken? yes

* distance upstream (Up) of benchmark

Habitat Unit Type bottom of habitat unit* top of habitat unit* length of habitat unit (m) % slope Photo frame #
Riffle 0.000 10.600 12.200 1.500 y
Pool 10.600 14.800 3.010 2.000 y
Riffle 14.800 25.200 10.450 7.000 y
Pool 25.200 37.600 13.200 1.000 y
Riffle 37.600 41.400 3.300 2.000 y
Pool 41.400 43.000 1.700 3.000 y
Riffle 43.000 56.800 14.100 2.500 y
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0

* distance downstream (Dn) of benchmark

Habitat Unit Type bottom of habitat unit* top of habitat unit* length of habitat unit (m) % slope Photo frame #
Riffle 0.000 11.100 12.400 1.000 y
Pool 11.100 15.100 4.400 1.000 y
Riffle 15.100 23.500 9.100 0.500 y
Pool 23.500 30.900 7.800 1.000 y
Riffle 30.900 35.200 5.000 1.000 y
Pool 35.200 44.800 9.600 0.500 y
Riffle 44.800 51.600 7.100 1.000 y
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Step 5 HABITAT CHARACTERISTICS
1. Streambed material (from 25 samples)
Fines: 12.00 %
Gravel: 64.00 %
Cobble: 24.00 %
Boulder: 0.00 %
Bedrock: 0.00 %
Cobble and Boulder Total: 0.00 %
2. % Embeddness 35.00 %
Instream cover
Large Woody debris: 72.00 pieces
Rooted cutbank: number of instances 22.00
4. Percent Pool Habitat
Average % Survey Slope 1.79 %
Total length of pools: 39.71
Length of Reference Site: 113.36
Pool Habitat: 35.03 %
5. Off Channel Habitat
Details:
Size:
Present: none
6. Bank Stability
Active Erosion Left Bank:
Active Erosion Left Bank Length:
Active Erosion Right Bank: 3
Active Erosion Right Bank Length: 8.10
Bank Stabilzation Left Bank: 1
Bank Stabilzation Left Bank Length:
Bank Stabilzation Right Bank:
Bank Stabilzation Right Bank Length: 7.80
Slides Reaching Channel Left Bank:
Slides Reaching Channel Left Bank Length:
Slides Reaching Channel Right Bank:
Slides Reaching Channel Right Bank Length:
7. Length of bank with no vegetation (m)
Left Bank: 0.00
Right Bank: 0.00
8. Overhead Canopy
Bankfull Channel covered by overhanging branches: 90.00 %
9. Riparian zone
# of channel widths: 4.00
Coniferous trees: 0.25
Deciduous trees: 0.5
Shrubs: 0.5
Grass: 0.25
Adjacent Land Use and Impacts:
Urban residential, park school, personal dog wakers, homeless