Advanced Stream Habitat Survey Data Sheet - Module 2
Step 5 LONGITUDINAL SURVEY, MEASUREMENTS
Length of Survey Site Minimum: 52.560 (m) Actual: 41.900 (m) Photos Taken? yes
Upstream Survey Boundary Minimum: 26.280 (m) Actual:41.900 (m) Photos Taken? yes
Downstream Survey Boundary Minimum: 26.280 (m) Actual: 0.000(m) Photos Taken? no

* distance upstream (Up) of benchmark

Habitat Unit Type bottom of habitat unit* top of habitat unit* length of habitat unit (m) % slope Photo frame #
Riffle 0.000 2.100 2.450 1.000 y
Pool 2.100 22.900 21.200 1.000 y
Riffle 22.900 25.100 2.000 0.500 y
Pool 25.100 41.900 16.700 2.000 y
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0

* distance downstream (Dn) of benchmark

Habitat Unit Type bottom of habitat unit* top of habitat unit* length of habitat unit (m) % slope Photo frame #
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Step 5 HABITAT CHARACTERISTICS
1. Streambed material (from 25 samples)
Fines: 0.00 %
Gravel: %
Cobble: 84.00 %
Boulder: 16.00 %
Bedrock: 0.00 %
Cobble and Boulder Total: 0.00 %
2. % Embeddness 10.00 %
Instream cover
Large Woody debris: 12.00 pieces
Rooted cutbank: number of instances
4. Percent Pool Habitat
Average % Survey Slope 1.13 %
Total length of pools: 37.9
Length of Reference Site: 42.35
Pool Habitat: 89.49 %
5. Off Channel Habitat
Details:
Size:
Present: none
6. Bank Stability
Active Erosion Left Bank: 1
Active Erosion Left Bank Length: 4.40
Active Erosion Right Bank: 2
Active Erosion Right Bank Length: 14.30
Bank Stabilzation Left Bank:
Bank Stabilzation Left Bank Length:
Bank Stabilzation Right Bank:
Bank Stabilzation Right Bank Length:
Slides Reaching Channel Left Bank:
Slides Reaching Channel Left Bank Length:
Slides Reaching Channel Right Bank:
Slides Reaching Channel Right Bank Length:
7. Length of bank with no vegetation (m)
Left Bank: 1.20
Right Bank:
8. Overhead Canopy
Bankfull Channel covered by overhanging branches: 70.00 %
9. Riparian zone
# of channel widths: 2.00
Coniferous trees: 0.25
Deciduous trees: 0.5
Shrubs: 0.25
Grass: 0.5
Adjacent Land Use and Impacts:
Road running parallel to the slough, garbage. On a positive note their is a concerned and active community of people working on restoring the sloughs. A clean up of the roadway is held and they will n