Advanced Stream Habitat Survey Data Sheet - Module 2
Step 5 LONGITUDINAL SURVEY, MEASUREMENTS
Length of Survey Site |
Minimum: 37.200 (m) |
Actual: 23.900 (m) |
Photos Taken? yes |
Upstream Survey Boundary |
Minimum: 18.600 (m) |
Actual:23.900 (m) |
Photos Taken? yes |
Downstream Survey Boundary |
Minimum: 18.600 (m) |
Actual: 0.000(m) |
Photos Taken? no |
* distance upstream (Up) of benchmark
Habitat Unit Type |
bottom of habitat unit* |
top of habitat unit* |
length of habitat unit (m) |
% slope |
Photo frame # |
Riffle |
0.000 |
12.300 |
13.100 |
3.000 |
y |
Not Recorded |
12.300 |
23.900 |
11.900 |
1.000 |
7 |
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
* distance downstream (Dn) of benchmark
Habitat Unit Type |
bottom of habitat unit* |
top of habitat unit* |
length of habitat unit (m) |
% slope |
Photo frame # |
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Step 5 HABITAT CHARACTERISTICS
1. Streambed material (from 25 samples) |
Fines: |
4.00 % |
Gravel: |
% |
Cobble: |
68.00 % |
Boulder: |
28.00 % |
Bedrock: |
% |
Cobble and Boulder Total: |
0.00 % |
2. % Embeddness |
28.57 % |
Instream cover |
Large Woody debris: |
5.00 pieces |
Rooted cutbank: |
number of instances 2.00 |
4. Percent Pool Habitat |
Average % Survey Slope |
2.00 % |
Total length of pools: |
0 |
Length of Reference Site: |
25 |
Pool Habitat: |
0.00 % |
5. Off Channel Habitat |
Details: |
|
Size: |
|
Present: |
none |
6. Bank Stability |
Active Erosion Left Bank: |
|
Active Erosion Left Bank Length: |
|
Active Erosion Right Bank: |
|
Active Erosion Right Bank Length: |
|
Bank Stabilzation Left Bank: |
|
Bank Stabilzation Left Bank Length: |
|
Bank Stabilzation Right Bank: |
|
Bank Stabilzation Right Bank Length: |
|
Slides Reaching Channel Left Bank: |
|
Slides Reaching Channel Left Bank Length: |
|
Slides Reaching Channel Right Bank: |
|
Slides Reaching Channel Right Bank Length: |
|
7. Length of bank with no vegetation (m) |
Left Bank: |
|
Right Bank: |
23.90 |
8. Overhead Canopy |
Bankfull Channel covered by overhanging branches: |
95.00 % |
9. Riparian zone |
# of channel widths: |
2.00 |
Coniferous trees: |
0.5 |
Deciduous trees: |
0.25 |
Shrubs: |
0.25 |
Grass: |
0 |
Adjacent Land Use and Impacts: trailer storage area and trail (bikes, people, dogs, motor bikes, motorized unicycle)active main path and another non purposed path has been formed all along the side channel on the right bank |