Advanced Stream Habitat Survey Data Sheet - Module 2
Step 5 LONGITUDINAL SURVEY, MEASUREMENTS
Length of Survey Site Minimum: 62.400 (m) Actual: 31.500 (m) Photos Taken? no
Upstream Survey Boundary Minimum: 31.200 (m) Actual:31.500 (m) Photos Taken? no
Downstream Survey Boundary Minimum: 31.200 (m) Actual: 0.000(m) Photos Taken? no
No Upstream Habitats Entered.
No Downstream Habitats Entered.
Step 5 HABITAT CHARACTERISTICS
1. Streambed material (from 25 samples)
Fines: 28.00 %
Gravel: %
Cobble: 16.00 %
Boulder: 40.00 %
Bedrock: 16.00 %
Cobble and Boulder Total: 0.00 %
2. % Embeddness 33.50 %
Instream cover
Large Woody debris: 1.00 pieces
Rooted cutbank: number of instances 2.00
4. Percent Pool Habitat
Average % Survey Slope %
Total length of pools: 5.7
Length of Reference Site: 31.55
Pool Habitat: 18.07%
5. Off Channel Habitat
Details:
Size:
Present: none
6. Bank Stability
Active Erosion Left Bank:
Active Erosion Left Bank Length:
Active Erosion Right Bank:
Active Erosion Right Bank Length:
Bank Stabilzation Left Bank: 1
Bank Stabilzation Left Bank Length: 10.95
Bank Stabilzation Right Bank: 1
Bank Stabilzation Right Bank Length: 17.40
Slides Reaching Channel Left Bank:
Slides Reaching Channel Left Bank Length:
Slides Reaching Channel Right Bank:
Slides Reaching Channel Right Bank Length:
7. Length of bank with no vegetation (m)
Left Bank: 0.00
Right Bank: 0.00
8. Overhead Canopy
Bankfull Channel covered by overhanging branches: 85.00 %
9. Riparian zone
# of channel widths: 2.00
Coniferous trees: 0.25
Deciduous trees: 0.5
Shrubs: 0.5
Grass: 0.5
Adjacent Land Use and Impacts:
Heard lots of birds in this area, Steeper bank entry so limited human and pet activity here. Saw juvenile coho. very beautiful section of the stream. A bit of invasive plant life under the area that w