Advanced Stream Habitat Survey Data Sheet - Module 2
Step 5 LONGITUDINAL SURVEY, MEASUREMENTS
Length of Survey Site Minimum: 10.800 (m) Actual: 24.700 (m) Photos Taken? no
Upstream Survey Boundary Minimum: 10.800 (m) Actual:13.600 (m) Photos Taken? no
Downstream Survey Boundary Minimum: 10.800 (m) Actual: 11.100(m) Photos Taken? no

* distance upstream (Up) of benchmark

Habitat Unit Type bottom of habitat unit* top of habitat unit* length of habitat unit (m) % slope Photo frame #
Riffle 0.000 0.600 0.700 0.500 y
Pool 0.600 2.800 2.550 2.500 y
Riffle 2.800 8.600 6.380 4.000 y
Pool 8.600 10.000 1.100 1.000 y
Riffle 10.000 10.100 0.100 2.000 y
Pool 10.100 13.600 3.800 1.000 y
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0

* distance downstream (Dn) of benchmark

Habitat Unit Type bottom of habitat unit* top of habitat unit* length of habitat unit (m) % slope Photo frame #
Riffle 0.000 5.000 4.800 3.500 y
Pool 5.000 9.700 5.000 5.000 y
Riffle 9.700 11.100 1.100 1.000 y
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Step 5 HABITAT CHARACTERISTICS
1. Streambed material (from 25 samples)
Fines: 12.00 %
Gravel: 84.00 %
Cobble: 4.00 %
Boulder: %
Bedrock: %
Cobble and Boulder Total: 0.00 %
2. % Embeddness 69.00 %
Instream cover
Large Woody debris: 42.00 pieces
Rooted cutbank: number of instances 15.00
4. Percent Pool Habitat
Average % Survey Slope 2.28 %
Total length of pools: 12.45
Length of Reference Site: 25.53
Pool Habitat: 48.77 %
5. Off Channel Habitat
Details: none
Size:
Present: none
6. Bank Stability
Active Erosion Left Bank: 0
Active Erosion Left Bank Length:
Active Erosion Right Bank: 0
Active Erosion Right Bank Length:
Bank Stabilzation Left Bank: 0
Bank Stabilzation Left Bank Length:
Bank Stabilzation Right Bank: 0
Bank Stabilzation Right Bank Length:
Slides Reaching Channel Left Bank: 0
Slides Reaching Channel Left Bank Length:
Slides Reaching Channel Right Bank: 0
Slides Reaching Channel Right Bank Length:
7. Length of bank with no vegetation (m)
Left Bank: 0.00
Right Bank: 0.00
8. Overhead Canopy
Bankfull Channel covered by overhanging branches: 90.00 %
9. Riparian zone
# of channel widths: 2.00
Coniferous trees: 0.25
Deciduous trees: 0.5
Shrubs: 0.5
Grass: 0.5
Adjacent Land Use and Impacts:
Lovely treed creek, walkers enjoying the trails (staying on the trails) this area is being impacted by fines, there is a settling pond just upstream that should be capturing the fine particles, could