Advanced Stream Habitat Survey Data Sheet - Module 2
Step 5 LONGITUDINAL SURVEY, MEASUREMENTS
Length of Survey Site Minimum: 57.600 (m) Actual: 62.000 (m) Photos Taken? yes
Upstream Survey Boundary Minimum: 28.800 (m) Actual:30.800 (m) Photos Taken? yes
Downstream Survey Boundary Minimum: 28.800 (m) Actual: 31.200(m) Photos Taken? yes
No Upstream Habitats Entered.
No Downstream Habitats Entered.
Step 5 HABITAT CHARACTERISTICS
1. Streambed material (from 25 samples)
Fines: 16.00 %
Gravel: 44.00 %
Cobble: 40.00 %
Boulder: 0.00 %
Bedrock: 0.00 %
Cobble and Boulder Total: 0.00 %
2. % Embeddness 35.00 %
Instream cover
Large Woody debris: 24.00 pieces
Rooted cutbank: number of instances 6.00
4. Percent Pool Habitat
Average % Survey Slope %
Total length of pools: 24.6
Length of Reference Site: 60.6
Pool Habitat: 40.59%
5. Off Channel Habitat
Details:
Size:
Present: none
6. Bank Stability
Active Erosion Left Bank: 1
Active Erosion Left Bank Length: 0.75
Active Erosion Right Bank:
Active Erosion Right Bank Length:
Bank Stabilzation Left Bank: 2
Bank Stabilzation Left Bank Length: 7.00
Bank Stabilzation Right Bank: 1
Bank Stabilzation Right Bank Length: 12.70
Slides Reaching Channel Left Bank:
Slides Reaching Channel Left Bank Length:
Slides Reaching Channel Right Bank:
Slides Reaching Channel Right Bank Length:
7. Length of bank with no vegetation (m)
Left Bank:
Right Bank:
8. Overhead Canopy
Bankfull Channel covered by overhanging branches: 75.00 %
9. Riparian zone
# of channel widths: 2.00
Coniferous trees: 0.5
Deciduous trees: 0.5
Shrubs: 0.5
Grass: 0.25
Adjacent Land Use and Impacts:
Park area, trail on left bank, fenced setback areas Group has planted the area well and added LWD, stabilization