Advanced Stream Habitat Survey Data Sheet - Module 2
Step 5 LONGITUDINAL SURVEY, MEASUREMENTS
Length of Survey Site |
Minimum: 57.600 (m) |
Actual: 62.000 (m) |
Photos Taken? yes |
Upstream Survey Boundary |
Minimum: 28.800 (m) |
Actual:30.800 (m) |
Photos Taken? yes |
Downstream Survey Boundary |
Minimum: 28.800 (m) |
Actual: 31.200(m) |
Photos Taken? yes |
* distance upstream (Up) of benchmark
Habitat Unit Type |
bottom of habitat unit* |
top of habitat unit* |
length of habitat unit (m) |
% slope |
Photo frame # |
Riffle |
0.000 |
6.100 |
6.000 |
0 |
|
Pool |
6.100 |
12.400 |
6.200 |
0 |
|
Riffle |
12.400 |
25.400 |
13.000 |
0 |
|
Pool |
25.400 |
30.800 |
5.000 |
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
* distance downstream (Dn) of benchmark
Habitat Unit Type |
bottom of habitat unit* |
top of habitat unit* |
length of habitat unit (m) |
% slope |
Photo frame # |
Riffle |
0.000 |
9.200 |
9.000 |
0 |
|
Pool |
9.200 |
13.900 |
4.400 |
0 |
|
Riffle |
13.900 |
16.200 |
2.000 |
0 |
|
Pool |
16.200 |
25.300 |
9.000 |
0 |
|
Riffle |
25.300 |
31.200 |
6.000 |
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Not Recorded |
|
|
|
0 |
|
Step 5 HABITAT CHARACTERISTICS
1. Streambed material (from 25 samples) |
Fines: |
16.00 % |
Gravel: |
44.00 % |
Cobble: |
40.00 % |
Boulder: |
0.00 % |
Bedrock: |
0.00 % |
Cobble and Boulder Total: |
0.00 % |
2. % Embeddness |
35.00 % |
Instream cover |
Large Woody debris: |
24.00 pieces |
Rooted cutbank: |
number of instances 6.00 |
4. Percent Pool Habitat |
Average % Survey Slope |
nan % |
Total length of pools: |
24.6 |
Length of Reference Site: |
60.6 |
Pool Habitat: |
40.59 % |
5. Off Channel Habitat |
Details: |
|
Size: |
|
Present: |
none |
6. Bank Stability |
Active Erosion Left Bank: |
1 |
Active Erosion Left Bank Length: |
0.75 |
Active Erosion Right Bank: |
|
Active Erosion Right Bank Length: |
|
Bank Stabilzation Left Bank: |
2 |
Bank Stabilzation Left Bank Length: |
7.00 |
Bank Stabilzation Right Bank: |
1 |
Bank Stabilzation Right Bank Length: |
12.70 |
Slides Reaching Channel Left Bank: |
|
Slides Reaching Channel Left Bank Length: |
|
Slides Reaching Channel Right Bank: |
|
Slides Reaching Channel Right Bank Length: |
|
7. Length of bank with no vegetation (m) |
Left Bank: |
|
Right Bank: |
|
8. Overhead Canopy |
Bankfull Channel covered by overhanging branches: |
75.00 % |
9. Riparian zone |
# of channel widths: |
2.00 |
Coniferous trees: |
0.5 |
Deciduous trees: |
0.5 |
Shrubs: |
0.5 |
Grass: |
0.25 |
Adjacent Land Use and Impacts: Park area, trail on left bank, fenced setback areas Group has planted the area well and added LWD, stabilization |