Module 3 Water Quality Index

Stream Name: PEACH CREEK-Chilliwa | Survey Date: January 24th, 2016
Chemical Test Result Q-value Weighting Index Value
Temperature Change: Temperature 7 90.00 X 0.10 = 9
Oxygen Saturation: 92.00 83.00 x 0.17 = 14.11
pH (units): 7.15 92.00 x 0.11 = 10.12
Turbidity (cm): 90.00 72.00 x 0.08 = 5.76
Total = Water Quality Index (Compare this value to the Water Quality Chart below)
38.99
Water Quality Chart
Good 40-45 Acceptable 30-40 Marginal 20-30 Poor < 20

Survey Results

Stream Name: PEACH CREEK-Chilliwa Survey Date: January 24th, 2016
Organization Name: WaterWealth Project Project Name: WEX
Data Entered by: Jan Vinoya Survey ID: 173

Step 1 Temperature

Time of Day Air Temp (0o) Water Temp (0o)
am
pm 7.00 7.00
Difference in water temperature: 7
Q Value:90.00
Site Air Temp(0o) Water Temp(0o)
Upstream:
Downstream:
Difference in water temperature: 7
Q Value:
Step 2 Dissolved Oxygen
Concentration
(mg/l):
11.00
% Saturation: 92.00
Equipment (if not Hach):
Step 3 pH
pH Reading: 7.15
Equipment: pH meter
Nitrites:
Conductivity:
Other one:
Step 4 Turbidity
Tubdity (JTU):
Tubdity (NTU):
Tubdity (cm): 90.00
Tubdity (cm) greater than (>):
Background Tubdity:
Tubdity increase over background:
Equipment