Module 3 Water Quality Index

Stream Name: PEACH CREEK | Survey Date: August 31st, 2020
Chemical Test Result Q-value Weighting Index Value
Temperature Change: Temperature 1.37 88.00 X 0.10 = 8.8
Oxygen Saturation: 88.40 94.00 x 0.17 = 15.98
pH (units): 8.10 79.00 x 0.11 = 8.69
Turbidity (cm): 0.00 97.00 x 0.08 = 7.76
Total = Water Quality Index (Compare this value to the Water Quality Chart below)
41.23
Water Quality Chart
Good 40-45 Acceptable 30-40 Marginal 20-30 Poor < 20

Survey Results

Stream Name: PEACH CREEK Survey Date: August 31st, 2020
Organization Name: WaterWealth Project Project Name: Climate Monitoring
Data Entered by: Ian Stephen Survey ID: 444

Step 1 Temperature

Time of Day Air Temp (0o) Water Temp (0o)
08:00:00 am Not recorded 14.41
17:00:00 pm 17.00 15.78
Difference in water temperature: 1.37
Q Value:88.00
Site Air Temp(0o) Water Temp(0o)
Upstream: Not recorded Not recorded
Downstream: Not recorded Not recorded
Difference in water temperature: Not enough data
Q Value:0.00
Step 2 Dissolved Oxygen
Concentration
(mg/l):
0.00
% Saturation: 88.40
Equipment (if not Hach): Oxyguard Handy
Step 3 pH
pH Reading: 8.10
Equipment: Oakton pHTestr
Nitrites: 0.00
Conductivity: 0.00
Other one: 0.00
Step 4 Turbidity
Tubdity (JTU): 0.00
Tubdity (NTU): 0.00
Tubdity (cm): 0.00
Tubdity (cm) greater than (>): 120.00
Background Tubdity: 0.00
Tubdity increase over background: 0.00
Equipment Turbidity Tube