Module 2 - Longitudinal Survey

Pool Habitat

Stream Name: BEAR CREEK Survey Date: 2001-08-28
Organization Name: Katim Project Name: MEET
Stream Segment #: 1 Stream Section #: 1
Data Entered by: Survey ID: 1

Step 4.1 Longitudinal Survey, Measurements

Length of Survey Site Minimum: 51.600 (m) Actual: 203.300 (m) Photos Taken? no
Upstream Survey Boundary Minimum: 51.600 (m) Actual:98.300 (m) Photos Taken? no
Downstream Survey Boundary Minimum: 51.600 (m) Actual: 105.000(m) Photos Taken? no

* distance upstream (Up) of benchmark

Habitat Unit Typebottom of habitat unit*top of habitat unit*length of habitat unit (m)% slopePhoto frame #
Pool 0.000 18.300 18.300 0.000
Riffle 18.300 21.400 3.100 2.000
Pool 21.400 48.600 27.200 0.000
Riffle 58.600 98.300 49.700 3.000
Choose 0
Choose 0
Choose 0
0
0
0
0
0
0

* distance downstream (Dn) of benchmark

Habitat Unit Typebottom of habitat unit*top of habitat unit*length of habitat unit (m)% slopePhoto frame #
Riffle 0.000 19.800 19.800 1.000
Pool 19.800 34.300 14.500 0.000
Riffle 34.300 81.600 47.300 25.000
Pool 81.600 88.900 7.300 0.000
Riffle 88.900 105.000 16.100 1.000
Choose 0
Choose 0
0
0
0
0
0
0

Step 4.2 Longitudinal Survey, Habitat Quality

1. Streambed material (from 25 samples)
Fines: 16.00 %
Gravel: 20.00 %
Cobble: 44.00 %
Boulder: 20.00 %
Bedrock: 0.00 %
Cobble and Boulder Total: 64.00 %
2. % Embeddness 42.60 %
Instream cover
Large Woody debris: 15.00 pieces
Rooted cutbank: number of instances 41.00
4. Percent Pool Habitat
Average % Survey Slope 3.56 %
Total length of pools: 67.3
Length of Reference Site: 203.3
Pool Habitat: 33.10 %
5. Off Channel Habitat
Details: none
Size:
Present:
6. Bank Stability
Active Erosion Left Bank: 1
Active Erosion Left Bank Length: 7.00
Active Erosion Right Bank: 1
Active Erosion Right Bank Length: 10.00
Bank Stabilzation Left Bank: 1
Bank Stabilzation Left Bank Length: 3.00
Bank Stabilzation Right Bank: 1
Bank Stabilzation Right Bank Length: 3.00
Slides Reaching Channel Left Bank:
Slides Reaching Channel Left Bank Length:
Slides Reaching Channel Right Bank:
Slides Reaching Channel Right Bank Length:
7. Length of bank with no vegetation (m)
Left Bank: 0.00
Right Bank: 0.00
8. Overhead Canopy
Bankfull Channel covered by overhanging branches: 30.00 %
9. Riparian zone
# of channel widths: 2.00
Coniferous trees: 0.5
Deciduous trees: 0.25
Shrubs: 0.5
Grass: 0.5
Adjacent Land Use and Impacts: