Module 2 - Longitudinal Survey

Pool Habitat

Stream Name: HASTINGS CREEK Survey Date: 2000-02-12
Organization Name: North Shore Streamkeepers Project Name:
Stream Segment #: Stream Section #:
Data Entered by: TIM MORTEN Survey ID: 36

Step 4.1 Longitudinal Survey, Measurements

Length of Survey Site Minimum: 54.000 (m) Actual: 59.700 (m) Photos Taken? no
Upstream Survey Boundary Minimum: 27.000 (m) Actual:31.100 (m) Photos Taken? no
Downstream Survey Boundary Minimum: 27.000 (m) Actual: 28.600(m) Photos Taken? no

* distance upstream (Up) of benchmark

Habitat Unit Typebottom of habitat unit*top of habitat unit*length of habitat unit (m)% slopePhoto frame #
Riffle 0.900 0.900 3.000
Pool 0.900 5.800 4.900 75.000
Riffle 5.800 14.600 10.000 4.000
Pool 14.600 19.000 4.000 1.750
Riffle 19.000 31.100 11.900 3.750
Choose 0
Choose 0
Choose 0
Choose 0
Choose 0
Choose 0
Choose 0
Choose 0

* distance downstream (Dn) of benchmark

Habitat Unit Typebottom of habitat unit*top of habitat unit*length of habitat unit (m)% slopePhoto frame #
Riffle 7.800 8.000 2.000
Pool 7.800 10.700 2.900 1.000
Riffle 10.700 15.800 4.000 5.250
Pool 15.800 21.900 6.100 0.500
Riffle 21.900 28.600 6.300 6.500
Choose 0
Choose 0
Choose 0
Choose 0
Choose 0
Choose 0
Choose 0
Choose 0

Step 4.2 Longitudinal Survey, Habitat Quality

1. Streambed material (from 25 samples)
Fines: %
Gravel: 68.00 %
Cobble: 32.00 %
Boulder: %
Bedrock: %
Cobble and Boulder Total: 0.00 %
2. % Embeddness 27.00 %
Instream cover
Large Woody debris: 1.50 pieces
Rooted cutbank: number of instances 0.75
4. Percent Pool Habitat
Average % Survey Slope 10.28 %
Total length of pools: 17.9
Length of Reference Site: 59
Pool Habitat: 30.34 %
5. Off Channel Habitat
Details:
Size:
Present: none
6. Bank Stability
Active Erosion Left Bank:
Active Erosion Left Bank Length:
Active Erosion Right Bank: 4
Active Erosion Right Bank Length: 13.70
Bank Stabilzation Left Bank:
Bank Stabilzation Left Bank Length:
Bank Stabilzation Right Bank:
Bank Stabilzation Right Bank Length:
Slides Reaching Channel Left Bank:
Slides Reaching Channel Left Bank Length:
Slides Reaching Channel Right Bank:
Slides Reaching Channel Right Bank Length:
7. Length of bank with no vegetation (m)
Left Bank:
Right Bank:
8. Overhead Canopy
Bankfull Channel covered by overhanging branches: 60.00 %
9. Riparian zone
# of channel widths: 20.00
Coniferous trees: 0.5
Deciduous trees: 0.5
Shrubs: 0.5
Grass: 0.25
Adjacent Land Use and Impacts: