Module 2 - Longitudinal Survey

Pool Habitat

Stream Name: MACKAY CREEK Survey Date: 2014-08-26
Organization Name: PSKF Project Name: ISMPMackay
Stream Segment #: Stream Section #:
Data Entered by: PM Survey ID: 40

Step 4.1 Longitudinal Survey, Measurements

Length of Survey Site Minimum: (m) Actual: 130.400 (m) Photos Taken? no
Upstream Survey Boundary Minimum: (m) Actual:51.000 (m) Photos Taken? no
Downstream Survey Boundary Minimum: (m) Actual: 79.400(m) Photos Taken? no

* distance upstream (Up) of benchmark

Habitat Unit Typebottom of habitat unit*top of habitat unit*length of habitat unit (m)% slopePhoto frame #
Riffle 0.000 15.300 15.300 0.050
Pool 15.300 29.800 14.250 1.000
Riffle 29.800 37.600 6.600 0.000
Pool 37.600 49.200 12.100 0.000
Riffle 49.200 79.400 29.100 1.500
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0

* distance downstream (Dn) of benchmark

Habitat Unit Typebottom of habitat unit*top of habitat unit*length of habitat unit (m)% slopePhoto frame #
Pool 0.000 2.100 2.200 1.000
Riffle 2.100 19.600 18.100 2.000
Pool 19.600 21.500 3.100 0.000
Riffle 21.500 49.400 26.200 2.000
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0

Step 4.2 Longitudinal Survey, Habitat Quality

1. Streambed material (from 25 samples)
Fines: %
Gravel: %
Cobble: %
Boulder: %
Bedrock: %
Cobble and Boulder Total: 0.00 %
2. % Embeddness 18.00 %
Instream cover
Large Woody debris: 11.00 pieces
Rooted cutbank: number of instances 8.00
4. Percent Pool Habitat
Average % Survey Slope 0.84 %
Total length of pools: 31.65
Length of Reference Site: 126.95
Pool Habitat: 24.93 %
5. Off Channel Habitat
Details:
Size:
Present: none
6. Bank Stability
Active Erosion Left Bank: 15.
Active Erosion Left Bank Length:
Active Erosion Right Bank: 20.
Active Erosion Right Bank Length:
Bank Stabilzation Left Bank: 10.
Bank Stabilzation Left Bank Length:
Bank Stabilzation Right Bank: 46.
Bank Stabilzation Right Bank Length:
Slides Reaching Channel Left Bank:
Slides Reaching Channel Left Bank Length:
Slides Reaching Channel Right Bank:
Slides Reaching Channel Right Bank Length:
7. Length of bank with no vegetation (m)
Left Bank: 34.50
Right Bank: 34.50
8. Overhead Canopy
Bankfull Channel covered by overhanging branches: 85.00 %
9. Riparian zone
# of channel widths:
Coniferous trees: 0
Deciduous trees: 0
Shrubs: 0
Grass: 0
Adjacent Land Use and Impacts: