Module 2 - Longitudinal Survey

Pool Habitat

Stream Name: LIZARD CREEK Survey Date: 2014-10-05
Organization Name: Elk River Alliance Project Name: CBWM-LC site 1
Stream Segment #: Stream Section #:
Data Entered by: Ayla Bennett Survey ID: 48

Step 4.1 Longitudinal Survey, Measurements

Length of Survey Site Minimum: 114.000 (m) Actual: 114.000 (m) Photos Taken? yes
Upstream Survey Boundary Minimum: 57.000 (m) Actual:57.000 (m) Photos Taken? yes
Downstream Survey Boundary Minimum: 57.000 (m) Actual: 57.000(m) Photos Taken? yes

* distance upstream (Up) of benchmark

Habitat Unit Typebottom of habitat unit*top of habitat unit*length of habitat unit (m)% slopePhoto frame #
Riffle 0.000 57.000 57.000 0 346
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0

* distance downstream (Dn) of benchmark

Habitat Unit Typebottom of habitat unit*top of habitat unit*length of habitat unit (m)% slopePhoto frame #
Riffle 0.000 57.000 57.000 0 345
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0

Step 4.2 Longitudinal Survey, Habitat Quality

1. Streambed material (from 25 samples)
Fines: 0.00 %
Gravel: 32.00 %
Cobble: 44.00 %
Boulder: 24.00 %
Bedrock: 0.00 %
Cobble and Boulder Total: 0.00 %
2. % Embeddness 5.00 %
Instream cover
Large Woody debris: 1.00 pieces
Rooted cutbank: number of instances 0.00
4. Percent Pool Habitat
Average % Survey Slope nan %
Total length of pools: 0
Length of Reference Site: 114
Pool Habitat: 0.00 %
5. Off Channel Habitat
Details:
Size:
Present: none
6. Bank Stability
Active Erosion Left Bank: 1
Active Erosion Left Bank Length: 20.00
Active Erosion Right Bank: 1
Active Erosion Right Bank Length: 20.00
Bank Stabilzation Left Bank:
Bank Stabilzation Left Bank Length:
Bank Stabilzation Right Bank: 1
Bank Stabilzation Right Bank Length: 20.00
Slides Reaching Channel Left Bank:
Slides Reaching Channel Left Bank Length:
Slides Reaching Channel Right Bank:
Slides Reaching Channel Right Bank Length:
7. Length of bank with no vegetation (m)
Left Bank: 0.00
Right Bank: 0.00
8. Overhead Canopy
Bankfull Channel covered by overhanging branches: 30.00 %
9. Riparian zone
# of channel widths: 0.00
Coniferous trees: 0.25
Deciduous trees: 0.25
Shrubs: 0.5
Grass: 0.25
Adjacent Land Use and Impacts:
highway, bridge downstream, forest