Module 2 - Longitudinal Survey

Pool Habitat

Stream Name: WINDEBANK CREEK Survey Date: 2014-06-24
Organization Name: Mission of Streams Project Name: Windebank Monitoring
Stream Segment #: Stream Section #:
Data Entered by: DU Survey ID: 53

Step 4.1 Longitudinal Survey, Measurements

Length of Survey Site Minimum: 18.000 (m) Actual: 48.000 (m) Photos Taken? yes
Upstream Survey Boundary Minimum: 18.000 (m) Actual:30.000 (m) Photos Taken? yes
Downstream Survey Boundary Minimum: 18.000 (m) Actual: 18.000(m) Photos Taken? yes

* distance upstream (Up) of benchmark

Habitat Unit Typebottom of habitat unit*top of habitat unit*length of habitat unit (m)% slopePhoto frame #
Riffle 0.000 6.400 6.400 2.000 9
Pool 6.400 10.300 3.900 2.500 10
Riffle 10.300 30.000 20.000 2.000 11
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0

* distance downstream (Dn) of benchmark

Habitat Unit Typebottom of habitat unit*top of habitat unit*length of habitat unit (m)% slopePhoto frame #
Pool 14.500 17.000 2.500 1.000 3, 4
Riffle 11.100 14.500 3.400 1.500 5, 6
Pool 8.000 11.100 3.100 1.500 7, 8
Riffle 0.000 8.000 8.000 2.000 9
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0

Step 4.2 Longitudinal Survey, Habitat Quality

1. Streambed material (from 25 samples)
Fines: 16.00 %
Gravel: 74.00 %
Cobble: 10.00 %
Boulder: 0.00 %
Bedrock: 0.00 %
Cobble and Boulder Total: 0.00 %
2. % Embeddness 50.00 %
Instream cover
Large Woody debris: 15.00 pieces
Rooted cutbank: number of instances 4.00
4. Percent Pool Habitat
Average % Survey Slope 1.79 %
Total length of pools: 9.5
Length of Reference Site: 47.3
Pool Habitat: 20.08 %
5. Off Channel Habitat
Details: none
Size: 7.5 m length x 0.8 m widt
Present: seco
6. Bank Stability
Active Erosion Left Bank: 0
Active Erosion Left Bank Length:
Active Erosion Right Bank:
Active Erosion Right Bank Length:
Bank Stabilzation Left Bank: 0
Bank Stabilzation Left Bank Length:
Bank Stabilzation Right Bank:
Bank Stabilzation Right Bank Length:
Slides Reaching Channel Left Bank: 0
Slides Reaching Channel Left Bank Length:
Slides Reaching Channel Right Bank:
Slides Reaching Channel Right Bank Length:
7. Length of bank with no vegetation (m)
Left Bank: 0.00
Right Bank: 0.00
8. Overhead Canopy
Bankfull Channel covered by overhanging branches: 60.00 %
9. Riparian zone
# of channel widths: 4.00
Coniferous trees: 0
Deciduous trees: 0.25
Shrubs: 0.5
Grass: 0.25
Adjacent Land Use and Impacts:
The section is surrounded by road, highway, strip mall, on all sides. On west side of stream, there is a shopping mall and parking lot. On east side, there is a strip mall and road. The Lougheed Highw