Module 2 - Longitudinal Survey

Pool Habitat

Stream Name: MCMILLAN CREEK Survey Date: 2001-05-23
Organization Name: Pacific Streamkeepers Federationnorth Project Name: Prince George
Stream Segment #: Stream Section #:
Data Entered by: Zo Ann Survey ID: 60

Step 4.1 Longitudinal Survey, Measurements

Length of Survey Site Minimum: 39.000 (m) Actual: 74.000 (m) Photos Taken? no
Upstream Survey Boundary Minimum: 19.500 (m) Actual:18.700 (m) Photos Taken? no
Downstream Survey Boundary Minimum: 19.500 (m) Actual: 56.000(m) Photos Taken? no

* distance upstream (Up) of benchmark

Habitat Unit Typebottom of habitat unit*top of habitat unit*length of habitat unit (m)% slopePhoto frame #
Riffle 0.000 6.200 7.400 8.000
Pool 6.200 9.000 2.600 2.000
Riffle 9.000 17.300 6.600 5.000
Pool 17.300 18.700 1.400 0.500
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0

* distance downstream (Dn) of benchmark

Habitat Unit Typebottom of habitat unit*top of habitat unit*length of habitat unit (m)% slopePhoto frame #
Pool 0.000 2.700 2.600 0.500
Riffle 2.700 56.500 53.400 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0

Step 4.2 Longitudinal Survey, Habitat Quality

1. Streambed material (from 25 samples)
Fines: 16.00 %
Gravel: 28.00 %
Cobble: 48.00 %
Boulder: 8.00 %
Bedrock: %
Cobble and Boulder Total: 0.00 %
2. % Embeddness 32.00 %
Instream cover
Large Woody debris: 21.00 pieces
Rooted cutbank: number of instances 5.00
4. Percent Pool Habitat
Average % Survey Slope 3.20 %
Total length of pools: 6.6
Length of Reference Site: 74
Pool Habitat: 8.92 %
5. Off Channel Habitat
Details:
Size:
Present: side
6. Bank Stability
Active Erosion Left Bank: 1
Active Erosion Left Bank Length: 2.20
Active Erosion Right Bank:
Active Erosion Right Bank Length:
Bank Stabilzation Left Bank:
Bank Stabilzation Left Bank Length:
Bank Stabilzation Right Bank:
Bank Stabilzation Right Bank Length:
Slides Reaching Channel Left Bank:
Slides Reaching Channel Left Bank Length:
Slides Reaching Channel Right Bank:
Slides Reaching Channel Right Bank Length:
7. Length of bank with no vegetation (m)
Left Bank:
Right Bank:
8. Overhead Canopy
Bankfull Channel covered by overhanging branches: 5.00 %
9. Riparian zone
# of channel widths: 5.00
Coniferous trees: 0.5
Deciduous trees: 0.25
Shrubs: 0.5
Grass: 0.5
Adjacent Land Use and Impacts:
road, culvert mobile home zoning