Module 2 - Longitudinal Survey

Pool Habitat

Stream Name: SHILLESTEAD BROOK Survey Date: 2016-09-21
Organization Name: UNBC Project Name: Sk's training
Stream Segment #: Stream Section #:
Data Entered by: Zo Ann Morten Survey ID: 65

Step 4.1 Longitudinal Survey, Measurements

Length of Survey Site Minimum: 36.000 (m) Actual: 38.700 (m) Photos Taken? no
Upstream Survey Boundary Minimum: 18.000 (m) Actual:20.300 (m) Photos Taken? no
Downstream Survey Boundary Minimum: 18.000 (m) Actual: 18.400(m) Photos Taken? no

* distance upstream (Up) of benchmark

Habitat Unit Typebottom of habitat unit*top of habitat unit*length of habitat unit (m)% slopePhoto frame #
Riffle 0.000 4.100 4.500 2.000 y
Pool 4.100 4.900 0.600 0.000 y
Riffle 4.900 9.400 4.750 0.500 y
Pool 9.400 10.400 1.400 1.000 y
Riffle 104.000 20.300 9.200 2.000 y
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0

* distance downstream (Dn) of benchmark

Habitat Unit Typebottom of habitat unit*top of habitat unit*length of habitat unit (m)% slopePhoto frame #
Riffle 0.000 9.700 9.800 2.000 y
Pool 9.700 12.400 3.100 2.000 y
Riffle 12.400 18.400 6.200 1.000 y
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0

Step 4.2 Longitudinal Survey, Habitat Quality

1. Streambed material (from 25 samples)
Fines: 12.00 %
Gravel: 56.00 %
Cobble: 32.00 %
Boulder: 0.00 %
Bedrock: 0.00 %
Cobble and Boulder Total: 0.00 %
2. % Embeddness 54.00 %
Instream cover
Large Woody debris: 8.00 pieces
Rooted cutbank: number of instances 1.00
4. Percent Pool Habitat
Average % Survey Slope 1.31 %
Total length of pools: 5.1
Length of Reference Site: 39.55
Pool Habitat: 12.90 %
5. Off Channel Habitat
Details:
Size:
Present: none
6. Bank Stability
Active Erosion Left Bank: 1
Active Erosion Left Bank Length: 0.90
Active Erosion Right Bank: 0
Active Erosion Right Bank Length: 0.00
Bank Stabilzation Left Bank: 0
Bank Stabilzation Left Bank Length: 0.00
Bank Stabilzation Right Bank: 0
Bank Stabilzation Right Bank Length: 0.00
Slides Reaching Channel Left Bank: 0
Slides Reaching Channel Left Bank Length: 0.00
Slides Reaching Channel Right Bank: 0
Slides Reaching Channel Right Bank Length: 0.00
7. Length of bank with no vegetation (m)
Left Bank: 0.00
Right Bank: 0.00
8. Overhead Canopy
Bankfull Channel covered by overhanging branches: 80.00 %
9. Riparian zone
# of channel widths: 2.00
Coniferous trees: 0.25
Deciduous trees: 0.5
Shrubs: 0.5
Grass: 0.25
Adjacent Land Use and Impacts:
Active logging road, active hunting for grouse and moose, gravel pit area Wonderful little area to enjoy nature close to the city. We saw Chickadee, woodpeckers, eagle and grouse, a douglas squirrel