Module 2 - Longitudinal Survey

Pool Habitat

Stream Name: MACKAY CREEK Survey Date: 2019-07-14
Organization Name: PSKF Project Name: Streamkeepers traini
Stream Segment #: Stream Section #:
Data Entered by: ZoAnn Survey ID: 96

Step 4.1 Longitudinal Survey, Measurements

Length of Survey Site Minimum: 68.400 (m) Actual: 72.000 (m) Photos Taken? yes
Upstream Survey Boundary Minimum: 34.200 (m) Actual:72.000 (m) Photos Taken? no
Downstream Survey Boundary Minimum: 34.200 (m) Actual: (m) Photos Taken? no

* distance upstream (Up) of benchmark

Habitat Unit Typebottom of habitat unit*top of habitat unit*length of habitat unit (m)% slopePhoto frame #
Pool 0.000 9.000 9.000 0.000
Riffle 9.000 78.000 69.000 3.500
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0

* distance downstream (Dn) of benchmark

Habitat Unit Typebottom of habitat unit*top of habitat unit*length of habitat unit (m)% slopePhoto frame #
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0

Step 4.2 Longitudinal Survey, Habitat Quality

1. Streambed material (from 25 samples)
Fines: 20.00 %
Gravel: 40.00 %
Cobble: 0.00 %
Boulder: 40.00 %
Bedrock: 0.00 %
Cobble and Boulder Total: 0.00 %
2. % Embeddness 10.00 %
Instream cover
Large Woody debris: 30.00 pieces
Rooted cutbank: number of instances 14.00
4. Percent Pool Habitat
Average % Survey Slope 1.75 %
Total length of pools: 9
Length of Reference Site: 78
Pool Habitat: 11.54 %
5. Off Channel Habitat
Details:
Size:
Present: none
6. Bank Stability
Active Erosion Left Bank: 14
Active Erosion Left Bank Length:
Active Erosion Right Bank:
Active Erosion Right Bank Length:
Bank Stabilzation Left Bank:
Bank Stabilzation Left Bank Length:
Bank Stabilzation Right Bank:
Bank Stabilzation Right Bank Length:
Slides Reaching Channel Left Bank: 5
Slides Reaching Channel Left Bank Length:
Slides Reaching Channel Right Bank:
Slides Reaching Channel Right Bank Length:
7. Length of bank with no vegetation (m)
Left Bank: 37.00
Right Bank:
8. Overhead Canopy
Bankfull Channel covered by overhanging branches: 23.00 %
9. Riparian zone
# of channel widths: 4.00
Coniferous trees: 0.25
Deciduous trees: 0.5
Shrubs: 0.5
Grass: 0
Adjacent Land Use and Impacts:
Creek is in park area. Near the bridges is disturbed by activity levels but other area is in natural state. Coo, clean water and landscape