Module 2 - Longitudinal Survey

Pool Habitat

Stream Name: DEPARTURE CREEK Survey Date: 2019-12-10
Organization Name: Depature Bay Neighbourhood Association Project Name: Mod 2 for CWF
Stream Segment #: Stream Section #:
Data Entered by: ZoAnn Morten Survey ID: 97

Step 4.1 Longitudinal Survey, Measurements

Length of Survey Site Minimum: 57.600 (m) Actual: 62.000 (m) Photos Taken? yes
Upstream Survey Boundary Minimum: 28.800 (m) Actual:30.800 (m) Photos Taken? yes
Downstream Survey Boundary Minimum: 28.800 (m) Actual: 31.200(m) Photos Taken? yes

* distance upstream (Up) of benchmark

Habitat Unit Typebottom of habitat unit*top of habitat unit*length of habitat unit (m)% slopePhoto frame #
Riffle 0.000 6.100 6.000 0
Pool 6.100 12.400 6.200 0
Riffle 12.400 25.400 13.000 0
Pool 25.400 30.800 5.000 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0

* distance downstream (Dn) of benchmark

Habitat Unit Typebottom of habitat unit*top of habitat unit*length of habitat unit (m)% slopePhoto frame #
Riffle 0.000 9.200 9.000 0
Pool 9.200 13.900 4.400 0
Riffle 13.900 16.200 2.000 0
Pool 16.200 25.300 9.000 0
Riffle 25.300 31.200 6.000 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0

Step 4.2 Longitudinal Survey, Habitat Quality

1. Streambed material (from 25 samples)
Fines: 16.00 %
Gravel: 44.00 %
Cobble: 40.00 %
Boulder: 0.00 %
Bedrock: 0.00 %
Cobble and Boulder Total: 0.00 %
2. % Embeddness 35.00 %
Instream cover
Large Woody debris: 24.00 pieces
Rooted cutbank: number of instances 6.00
4. Percent Pool Habitat
Average % Survey Slope nan %
Total length of pools: 24.6
Length of Reference Site: 60.6
Pool Habitat: 40.59 %
5. Off Channel Habitat
Details:
Size:
Present: none
6. Bank Stability
Active Erosion Left Bank: 1
Active Erosion Left Bank Length: 0.75
Active Erosion Right Bank:
Active Erosion Right Bank Length:
Bank Stabilzation Left Bank: 2
Bank Stabilzation Left Bank Length: 7.00
Bank Stabilzation Right Bank: 1
Bank Stabilzation Right Bank Length: 12.70
Slides Reaching Channel Left Bank:
Slides Reaching Channel Left Bank Length:
Slides Reaching Channel Right Bank:
Slides Reaching Channel Right Bank Length:
7. Length of bank with no vegetation (m)
Left Bank:
Right Bank:
8. Overhead Canopy
Bankfull Channel covered by overhanging branches: 75.00 %
9. Riparian zone
# of channel widths: 2.00
Coniferous trees: 0.5
Deciduous trees: 0.5
Shrubs: 0.5
Grass: 0.25
Adjacent Land Use and Impacts:
Park area, trail on left bank, fenced setback areas Group has planted the area well and added LWD, stabilization