Module 2 - Longitudinal Survey

Pool Habitat

Stream Name: STONEY CREEK Survey Date:
Organization Name: PSKF Project Name: SK Training
Stream Segment #: Stream Section #:
Data Entered by: Zo Ann Survey ID: 98

Step 4.1 Longitudinal Survey, Measurements

Length of Survey Site Minimum: 90.000 (m) Actual: 47.800 (m) Photos Taken? no
Upstream Survey Boundary Minimum: 45.000 (m) Actual:47.800 (m) Photos Taken? yes
Downstream Survey Boundary Minimum: 45.000 (m) Actual: 0.000(m) Photos Taken? no

* distance upstream (Up) of benchmark

Habitat Unit Typebottom of habitat unit*top of habitat unit*length of habitat unit (m)% slopePhoto frame #
Riffle 0.000 9.600 8.900 2.000
Pool 9.600 23.600 12.800 0.500
Riffle 23.600 24.600 1.700 0.250
Pool 24.600 37.400 11.800 1.000
Riffle 37.400 47.800 10.700 1.000
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0

* distance downstream (Dn) of benchmark

Habitat Unit Typebottom of habitat unit*top of habitat unit*length of habitat unit (m)% slopePhoto frame #
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0
Not Recorded 0

Step 4.2 Longitudinal Survey, Habitat Quality

1. Streambed material (from 25 samples)
Fines: 16.00 %
Gravel: 60.00 %
Cobble: 24.00 %
Boulder: 0.00 %
Bedrock: 0.00 %
Cobble and Boulder Total: 0.00 %
2. % Embeddness 67.00 %
Instream cover
Large Woody debris: 4.00 pieces
Rooted cutbank: number of instances 4.00
4. Percent Pool Habitat
Average % Survey Slope 0.95 %
Total length of pools: 24.6
Length of Reference Site: 45.9
Pool Habitat: 53.59 %
5. Off Channel Habitat
Details:
Size:
Present: none
6. Bank Stability
Active Erosion Left Bank:
Active Erosion Left Bank Length:
Active Erosion Right Bank:
Active Erosion Right Bank Length:
Bank Stabilzation Left Bank:
Bank Stabilzation Left Bank Length:
Bank Stabilzation Right Bank:
Bank Stabilzation Right Bank Length:
Slides Reaching Channel Left Bank: 1
Slides Reaching Channel Left Bank Length: 1.80
Slides Reaching Channel Right Bank:
Slides Reaching Channel Right Bank Length:
7. Length of bank with no vegetation (m)
Left Bank: 0.00
Right Bank: 0.00
8. Overhead Canopy
Bankfull Channel covered by overhanging branches: 90.00 %
9. Riparian zone
# of channel widths: 2.00
Coniferous trees: many
Deciduous trees: many
Shrubs: many
Grass: many
Adjacent Land Use and Impacts:
Intact stream area, ivy taking a good hold on the trees. In a well maintained park, clean, well signed. Mama and cub in area. People walking, cycling, swimming. Great urban green space. Activities sta