Advanced Stream Habitat Survey Data Sheet - Module 2
No Assessment information found
Stream Name: TERMINAL CREEK | Survey Date: 2013-10-22 |
Organization Name: Bowen Island Fish & Wildlife Club | Project Name: Terminal Cr. above Carter Pond |
Stream Segment #: Terminal Cr. above Carter Pond | Stream Section #: |
Data entered by: Berni Claus | Survey ID: 22 |
Step 1 BENCHMARK LOCATION
Directions to Benchmark: |
Step 2 CROSS-SECTIONAL SURVEY
Latitude: | Longitude: |
Location relative to benchmark: | Photos Taken? |
Bankfull Channel Width: | Average Bankfull Depth: 0.00 |
Wetted Channel Width: | Average Wetted Depth: 0.00 |
Measurements taken every metres | Number of measurements taken: 0 |
First and Last Measurements Taken .1m from the streambank edge
Left Bank | Right Bank | |||||||||||||||
Wetted Depth | Wetted Depth | |||||||||||||||
Bankfull Depth | Bankfull Depth |
Step 3 CALCULATE DISCHARGE
Cross-sectional area of wetted stream (m2) | |||||||
Discharge Wetted Width: | Discharge Average Depth: | = 0.000 | |||||
Average Time (sec) | |||||||
0 | 0.00 | ||||||
Trial 1 | Trial 2 | Trial 3 | Trial 4 | Trial 5 | Total Trials | / 5 | Average Time |
Average Velocity (sec) | |||||||
0.00 | 0.000 | ||||||
Length (m) | Average Time (sec) | Average Velocity (m/sec) | |||||
Average Stream Discharge (m3/sec) | |||||||
0.00000 | 0.00000 | x 0.8 | 0.00000 | ||||
Cross sectional area (m2) | Average velocity (m/sec) | correction factor | Discharge (m3/sec) |