Advanced Stream Habitat Survey Data Sheet - Module 2
No Longitudinal information found
Stream Name: NOONS CREEK | Survey Date: 2018-06-03 |
Organization Name: PSKF | Project Name: Streamkeepers Training |
Stream Segment #: | Stream Section #: |
Data entered by: ZoAnn | Survey ID: 89 |
Step 1 BENCHMARK LOCATION
Directions to Benchmark: 6.0 m upstream of second footbridge from ocean on Noons Creek |
Step 2 CROSS-SECTIONAL SURVEY
Latitude: 49.28400 | Longitude: -122.83400 |
Location relative to benchmark: at | Photos Taken? yes |
Bankfull Channel Width: 5.20 | Average Bankfull Depth: 22.58 |
Wetted Channel Width: 4.10 | Average Wetted Depth: 9.63 |
Measurements taken every 0.50 metres | Number of measurements taken: 11 |
First and Last Measurements Taken .1m from the streambank edge
Left Bank | 0.10 | 1.00 | 1.50 | 2.00 | 2.50 | 3.00 | 3.50 | 4.00 | 4.50 | 5.00 | 5.10 | Right Bank | ||||
Wetted Depth | 3.00 | 14.00 | 20.00 | 0.00 | 10.00 | 3.00 | 17.00 | 10.00 | Wetted Depth | |||||||
Bankfull Depth | 19.40 | 27.00 | 36.00 | 38.00 | 16.00 | 22.00 | 14.00 | 30.00 | 32.00 | 8.00 | 6.00 | Bankfull Depth |
Step 3 CALCULATE DISCHARGE
Cross-sectional area of wetted stream (m2) | |||||||
Discharge Wetted Width: 4.100 | Discharge Average Depth: 0.100 | = 0.410 | |||||
Average Time (sec) | |||||||
28.000 | 26.000 | 25.000 | 27.000 | 22.000 | 128 | 25.60 | |
Trial 1 | Trial 2 | Trial 3 | Trial 4 | Trial 5 | Total Trials | / 5 | Average Time |
Average Velocity (sec) | |||||||
4.100 | 25.60 | 0.160 | |||||
Length (m) | Average Time (sec) | Average Velocity (m/sec) | |||||
Average Stream Discharge (m3/sec) | |||||||
0.41000 | 0.16016 | x 0.8 | 0.00525 | ||||
Cross sectional area (m2) | Average velocity (m/sec) | correction factor | Discharge (m3/sec) |